The framework of direct and indirect effect of project risk response-related measures on project performance in managing construction delay
Project performance can be enhanced via proper risk management, particularly with the development of risk response measures. Though delay issues have been explored in many studies, to date, no study has attempted to measure how delay factors and risk measures are associated with the project pe...
Saved in:
Main Author: | Karunakaran, Priyadatchini |
---|---|
Format: | Thesis |
Language: | English English English |
Published: |
2020
|
Subjects: | |
Online Access: | http://eprints.uthm.edu.my/941/1/24p%20PRIYADATCHINI%20KARUNAKARAN.pdf http://eprints.uthm.edu.my/941/3/PRIYADATCHINI%20KARUNAKARAN%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/941/2/PRIYADATCHINI%20KARUNAKARAN%20WATERMARK.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A model of an effective materials management for better project performance in construction industry
by: Mat Jusoh, Zairra
Published: (2018) -
Decision-making process framework at the planning phase of housing development project
by: Mohd Sofberi, Nurul Atiqah
Published: (2021) -
Study on promote occupational safety and health practices in construction projects
by: Shahna, Ebrahim Awadh Mubarak
Published: (2018) -
Study on mitigation factors for controlling cost overrun in construction project
by: Abdullah, Fatehi Mansoor Saad
Published: (2018) -
Critical success factors model (CSF’sM) affecting the competencies of civil engineer in construction project
by: Ismail, Hassan
Published: (2020)