Requirements analysis for SBS system and study review process iteration during requirements phase
This paper represented the experience gained and discussed the works done under the title “Requirements Analysis For SBS System And Study Review Process Iteration During Requirements Phase” by the author during her Industrial Attachment 2 Period, from 13th October 2008 to 13th March 2009, at HeiTech...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2009
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/10012/1/AlghamdiHananMusaferMFSKSM2009.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|