Preparing the Algerian construction industry for the post-COVID-19 reality
The COVID-19 pandemic has brought many challenges to the construction industry. The combination of an economic downturn and lockdown regulation has severely impacted the construction performance in Algeria. This paper aims to elaborate a list of proactive steps that can help local organisations to r...
Saved in:
Main Author: | AbdelLatif, Mebarki |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2021
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/101617/1/MebarkiAbdellatifMSKA2021.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Integration of as-built building information modeling and augmented reality in construction industry : a case study of the (UTM) ECO-HOME
by: Ahsan Usmani, Abdul Rahman
Published: (2018) -
The design and construction of post tensioned flat slab
by: Zakaria, Nurhidayah
Published: (2011) -
Factors affecting in the preparation of construction work schedule
by: Bong, Justin Chunn Tat
Published: (2009) -
Construction stage analysis of a post-tensioned segmental crosshead
by: Liew, Tian Fuh
Published: (2015) -
Collaborative usage of ICT DBMS in construction cost control : the post contract perspectives
by: Bandi, Shamsul Hadi
Published: (2008)