Investigation on auto-recloser deadtime for 275kv Kolopis-Segaliud Sabah Grid using PSCAD Software
The purpose of this study is to investigate the optimum deadtime for 275kV auto-recloser that improves the performance of 275kV Kolopis-Segaliud Sabah Grid Transmission Line. The outcome from this study has confirmed the optimum deadtime for 275kV auto-recloser through simulation using PSCAD Softwar...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2022
|
主题: | |
在线阅读: | http://eprints.utm.my/102722/1/RosyimahAbdAminMSKE2022.pdf.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|