Confined space bowtie risk assessment framework for sewerage treatment plant in construction project
The Langat Sewerage Treatment Plant (STP) project, which covers a 60.9 sq km catchment area starting from Cheras Batu 11 to Kajang, is a state-of-the-art and modern facility. The STP will be equipped with green technology initiatives and public facilities which can accommodate sewerage inflow around...
Saved in:
主要作者: | Amin, Zamree |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2021
|
主題: | |
在線閱讀: | http://eprints.utm.my/107044/1/ZamreeAminPFTIR2021.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Management issues in planning, design and construction of sewerage treatment plants
由: Yap, Jit Ming
出版: (2000) -
A general overview of odour control measures in sewerage treatment plants
由: Selvaratnam, Sivakumar
出版: (2002) -
Alternative sewerage system in Malaysia : a new construction technology
由: Goh, Hong Chun
出版: (2004) -
Assessment of sewerage treatment system and the resident perception in Taman Ungku Tun Aminah
由: Mohd. Kamil, Nor Amani Filzah
出版: (2007) -
Sewerage planning system
由: Zanal, Azuawati
出版: (2004)