Factors affecting the contractor’s mark-up size decision in Malaysia
Construction industry is a competitive industry and the only possible way for a contractor to survive is by winning the tenders and making profit. Therefore, a “right” mark-up size is essential for contractor which to maximum possible profit, at the same time keeping its bid at a competitive level....
Saved in:
Main Author: | Tey, Kim Hai |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/11137/1/TeyKimHaiMFKA2009.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Decision making by manager in contractor's organization
by: Shakibabarough, Azin
Published: (2013) -
Adoption of construction industry 4.0 among small and medium sized contractor in Malaysia
by: Shaharuddin, Ahmad Bukhori
Published: (2020) -
Two-stage continuous assessment decision support model for selection of contractors in Pakistan's public projects
by: Raza, Ali
Published: (2021) -
Factors influencing the project success from the contractors' perspective
by: Tenku Izham, Tenku Nur Shahrul Izami
Published: (2015) -
Measurement of liquid film flow on inclined wall using photochromic dye marking method
by: Nurrina, Rosli
Published: (2011)