Delay on the zone establishment work process in non-revenue water reduction project

The difference between amount of water put into the distribution system and the amount of water billed to consumers is termed as Non-Revenue Water (NRW). It is a major issue effecting water utilities in developing countries nowadays. NRW project in Selangor is outsourced so that it could be managed...

Full description

Saved in:
Bibliographic Details
Main Author: Krishnan, Desanan
Format: Thesis
Language:English
Published: 2007
Subjects:
Online Access:http://eprints.utm.my/id/eprint/11293/1/DesananKrishnanMFKA2007.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.11293
record_format uketd_dc
spelling my-utm-ep.112932018-07-30T08:39:33Z Delay on the zone establishment work process in non-revenue water reduction project 2007-11 Krishnan, Desanan TC Hydraulic engineering. Ocean engineering The difference between amount of water put into the distribution system and the amount of water billed to consumers is termed as Non-Revenue Water (NRW). It is a major issue effecting water utilities in developing countries nowadays. NRW project in Selangor is outsourced so that it could be managed in a more effective manner. Zone establishment is the main scope of work to be done for NRW Phase 2 Project in Selangor. Delay that occurs during the process of zone establishment makes the entire organization to be unorganized due to last minute work preparation and drop in quality of work. This process consists of several activities done by different departments in an organization. This study is done to identify the delay activities, factors that cause the delay and finally a new improved zone establishment work process will be recommended. The main aim of this study is to improve the current zone establishment work process so that delay can be minimized. There will be two stages of data collection and analysis. The first stage will be to identify the delay activities by studying the flow of activities for ten different zones. Identifying the factors that cause delay by interviewing the head of department and personal responsible for the delay will be the second stage of data collection and analysis. Overall there were three main activities that cause the major delay in the work process. Outcome from the interview done to the head of departments and personal responsible of those delay activities has shown indirectly the factors that causes the delay. There are four factors that have been identified and three strong strategies to minimize the problems are suggested. Finally a new improved zone establishment work process has been recommended. 2007-11 Thesis http://eprints.utm.my/id/eprint/11293/ http://eprints.utm.my/id/eprint/11293/1/DesananKrishnanMFKA2007.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering Abdul Majid, M.Z. (1997). “Non-excusable Delay in Construction.” Loughborough University, Singapore. Abdul Majid, M.Z. and Mc. Caffer R. (1997). “Factors of Non Excusable Delays That Influence Contractors Performance.” Alan Lambert and Zoran Kapelan. (2001). “Leakage Detection Techniques for Water Distribution System.” IWA Task Force, United Kingdom. Alan Lambert (2006). “Zone Establishment Techniques.” Journal of Water Loss Management Strategies. Volume 2 Chan Ngai Weng. (2004). “Non-Revenue Water.” Journal of Water Watch Penang. Christian W. Decker. (2001). “Managing Water Losses in Amman’s Renovated Network: A Case Study, Management of Environmental Quality.” Journal of International Water. Gary Mclay (2004). “District Meter Zoning (DMZ) in NRW Management.” H.Woltters, D.Ridder, E. Mostert. (2001). “Reduce NRW with Efficient Water Management.” Journal of Asian Water. Volume 39. Kraiem, Z.M. and Diekman, J.E. (1987). “Concurrent Delays in Construction Projects.” Jurnal of Construction Engineering and Management, Volume 113. Mohd Yusof Abdul Rahman. (2005). “Air Tidak Berhasil (NRW).” Journal on Penswastaan Air Di Malaysia. Volume 11. Syaukat, Yusman. (2004). “Water Management in the Jakarta Region, Indonesia.” Journal of the American Water Resources Association. Trauner. JR. T.J. (1990). “Construction Delays.” R.S. Means Company Inc., USA. Zubir Ahmad Memon. (2000). “Excusable Delays in Construction.” Master Thesis.
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TC Hydraulic engineering
Ocean engineering
spellingShingle TC Hydraulic engineering
Ocean engineering
Krishnan, Desanan
Delay on the zone establishment work process in non-revenue water reduction project
description The difference between amount of water put into the distribution system and the amount of water billed to consumers is termed as Non-Revenue Water (NRW). It is a major issue effecting water utilities in developing countries nowadays. NRW project in Selangor is outsourced so that it could be managed in a more effective manner. Zone establishment is the main scope of work to be done for NRW Phase 2 Project in Selangor. Delay that occurs during the process of zone establishment makes the entire organization to be unorganized due to last minute work preparation and drop in quality of work. This process consists of several activities done by different departments in an organization. This study is done to identify the delay activities, factors that cause the delay and finally a new improved zone establishment work process will be recommended. The main aim of this study is to improve the current zone establishment work process so that delay can be minimized. There will be two stages of data collection and analysis. The first stage will be to identify the delay activities by studying the flow of activities for ten different zones. Identifying the factors that cause delay by interviewing the head of department and personal responsible for the delay will be the second stage of data collection and analysis. Overall there were three main activities that cause the major delay in the work process. Outcome from the interview done to the head of departments and personal responsible of those delay activities has shown indirectly the factors that causes the delay. There are four factors that have been identified and three strong strategies to minimize the problems are suggested. Finally a new improved zone establishment work process has been recommended.
format Thesis
qualification_level Master's degree
author Krishnan, Desanan
author_facet Krishnan, Desanan
author_sort Krishnan, Desanan
title Delay on the zone establishment work process in non-revenue water reduction project
title_short Delay on the zone establishment work process in non-revenue water reduction project
title_full Delay on the zone establishment work process in non-revenue water reduction project
title_fullStr Delay on the zone establishment work process in non-revenue water reduction project
title_full_unstemmed Delay on the zone establishment work process in non-revenue water reduction project
title_sort delay on the zone establishment work process in non-revenue water reduction project
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2007
url http://eprints.utm.my/id/eprint/11293/1/DesananKrishnanMFKA2007.pdf
_version_ 1747814835726319616