Delay on the zone establishment work process in non-revenue water reduction project
The difference between amount of water put into the distribution system and the amount of water billed to consumers is termed as Non-Revenue Water (NRW). It is a major issue effecting water utilities in developing countries nowadays. NRW project in Selangor is outsourced so that it could be managed...
Saved in:
Main Author: | Krishnan, Desanan |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2007
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/11293/1/DesananKrishnanMFKA2007.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Seepage flow in homogeneous and zoned earthfill dams
by: Jusoh, Siti Norafida
Published: (2007) -
Transient seepage trend through zoned earthfill dam
by: Gunalan, G. Jaganat
Published: (2008) -
Comparison of water quality index (WQI) between Doe method and Harkin’s index
by: Lim, Fui Ling
Published: (2007) -
Subsurface flow and free water surface flow constructed wetland with magnetic field for leachate treatment
by: Md. Sa'at, Siti Kamariah
Published: (2006) -
Reduction of refraction effects due to inadequate sound velocity profile measurements in multibeam echosounder systems
by: Gunathilaka, M. D. E. K.
Published: (2008)