Delay on the zone establishment work process in non-revenue water reduction project
The difference between amount of water put into the distribution system and the amount of water billed to consumers is termed as Non-Revenue Water (NRW). It is a major issue effecting water utilities in developing countries nowadays. NRW project in Selangor is outsourced so that it could be managed...
Saved in:
主要作者: | Krishnan, Desanan |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2007
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/11293/1/DesananKrishnanMFKA2007.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Seepage flow in homogeneous and zoned earthfill dams
由: Jusoh, Siti Norafida
出版: (2007) -
Transient seepage trend through zoned earthfill dam
由: Gunalan, G. Jaganat
出版: (2008) -
Comparison of water quality index (WQI) between Doe method and Harkin’s index
由: Lim, Fui Ling
出版: (2007) -
Subsurface flow and free water surface flow constructed wetland with magnetic field for leachate treatment
由: Md. Sa'at, Siti Kamariah
出版: (2006) -
Reduction of refraction effects due to inadequate sound velocity profile measurements in multibeam echosounder systems
由: Gunathilaka, M. D. E. K.
出版: (2008)