Factors affecting in the preparation of construction work schedule

Construction scheduling is widely used in many construction projects today but there still exists a large disparity in the proper use of this tool. Many projects schedule is created at the beginning of the project and never reviewed or revised until a problem arises. Besides, contractors lack the sk...

Full description

Saved in:
Bibliographic Details
Main Author: Bong, Justin Chunn Tat
Format: Thesis
Language:English
Published: 2009
Subjects:
Online Access:http://eprints.utm.my/id/eprint/11325/1/JustinBongChunnMFKA2009.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.11325
record_format uketd_dc
spelling my-utm-ep.113252018-06-04T09:51:46Z Factors affecting in the preparation of construction work schedule 2009-06-30 Bong, Justin Chunn Tat TA Engineering (General). Civil engineering (General) Construction scheduling is widely used in many construction projects today but there still exists a large disparity in the proper use of this tool. Many projects schedule is created at the beginning of the project and never reviewed or revised until a problem arises. Besides, contractors lack the skills necessary for preparing good construction schedule. Therefore, the objectives of this study are to investigate the factors affecting the preparation of better construction schedule; establish the severity of these factors; and the methods of improvements for preparing better construction schedule. Comprehensive literature review has been conducted to gather the information on the factors affecting the preparation of construction work schedule followed by structured questionnaire distribution as a main tool to gain data to establish the severity of these factors. The data attained were analyzed using average index and frequency analysis. From the analysis highlighted, there were thirty-five (35) factors where these factors were divided into four (4) main categories which were project specific factors, project management, working condition and external environment related factors. Hence, the results showed the top three factors that have the highest rank were complexity of project, identification of critical activities and type of project involved. In conclusion, the study also identified recommendations that can be used by the project participants in order to prepare effective and good construction work schedule in the local construction industry. 2009-06 Thesis http://eprints.utm.my/id/eprint/11325/ http://eprints.utm.my/id/eprint/11325/1/JustinBongChunnMFKA2009.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TA Engineering (General)
Civil engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
Bong, Justin Chunn Tat
Factors affecting in the preparation of construction work schedule
description Construction scheduling is widely used in many construction projects today but there still exists a large disparity in the proper use of this tool. Many projects schedule is created at the beginning of the project and never reviewed or revised until a problem arises. Besides, contractors lack the skills necessary for preparing good construction schedule. Therefore, the objectives of this study are to investigate the factors affecting the preparation of better construction schedule; establish the severity of these factors; and the methods of improvements for preparing better construction schedule. Comprehensive literature review has been conducted to gather the information on the factors affecting the preparation of construction work schedule followed by structured questionnaire distribution as a main tool to gain data to establish the severity of these factors. The data attained were analyzed using average index and frequency analysis. From the analysis highlighted, there were thirty-five (35) factors where these factors were divided into four (4) main categories which were project specific factors, project management, working condition and external environment related factors. Hence, the results showed the top three factors that have the highest rank were complexity of project, identification of critical activities and type of project involved. In conclusion, the study also identified recommendations that can be used by the project participants in order to prepare effective and good construction work schedule in the local construction industry.
format Thesis
qualification_level Master's degree
author Bong, Justin Chunn Tat
author_facet Bong, Justin Chunn Tat
author_sort Bong, Justin Chunn Tat
title Factors affecting in the preparation of construction work schedule
title_short Factors affecting in the preparation of construction work schedule
title_full Factors affecting in the preparation of construction work schedule
title_fullStr Factors affecting in the preparation of construction work schedule
title_full_unstemmed Factors affecting in the preparation of construction work schedule
title_sort factors affecting in the preparation of construction work schedule
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2009
url http://eprints.utm.my/id/eprint/11325/1/JustinBongChunnMFKA2009.pdf
_version_ 1747814839683645440