Factors affecting in the preparation of construction work schedule
Construction scheduling is widely used in many construction projects today but there still exists a large disparity in the proper use of this tool. Many projects schedule is created at the beginning of the project and never reviewed or revised until a problem arises. Besides, contractors lack the sk...
Saved in:
主要作者: | Bong, Justin Chunn Tat |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2009
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/11325/1/JustinBongChunnMFKA2009.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Factors affecting the success of a construction project
由: Badri Hamid, Ahmed Ali
出版: (2013) -
Productivity rate of roof works for JKR school project scheduling
由: Rijal , Zuraida Zaini
出版: (2010) -
Productivity assessment and schedule compression index for construction project planning
由: Mansur, Shaiful Amri
出版: (2004) -
Key factors affecting the adaptation of prefabricated prefinished volumetric construction (PPVC) in Malaysia industry
由: Loh, Seng Yap
出版: (2019) -
Assessment of the potential benefits of four-dimensional planning and scheduling software in construction project
由: Rizal Yahya, Mohd. Syah
出版: (2010)