Concrete practice and defects during construction - case study
This study is implemented for collecting information whether the activities that carried out at site are complied to the standard specification. This study concentrate on activities such as preparation, delivery, pouring, compaction and curing of concrete. Besides, preparation and installation of fo...
Saved in:
Main Author: | Abdullah, Zafri |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/12225/1/ZafriAbdullahMFKA2008.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimization of steel fibre reinforced concrete as concrete topping in composite slab construction
by: Noor Nabilah, Sarbini
Published: (2014) -
Safety cost in pre-cast concrete construction
by: Alashwal, Mohammed Taher
Published: (2008) -
A case study on concrete problems in UTM
by: Julkarnain, Abdul Aziz
Published: (2006) -
Practical guide for demolishing reinforced concrete chimney
by: Sadi , Mohammadali Kazerooni
Published: (2010) -
The behavior of reinforce concrete beam with construction joint near the support
by: Al Hassan, Altoum Alagab Al Amin
Published: (2008)