Computerised building cost estimating system

Estimating is an important process in order to prepare cost estimating for a proposed project. Cost estimate will give client an overview towards the total cost needed to be spent based on design. Due to the importance of the cost estimate for a proposed project, the utilization of computer to prepa...

Full description

Saved in:
Bibliographic Details
Main Author: Marjuki, Mofti
Format: Thesis
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/id/eprint/1354/1/MoftiMarjukiMFKA2006.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.1354
record_format uketd_dc
spelling my-utm-ep.13542018-02-20T04:21:58Z Computerised building cost estimating system 2006-07 Marjuki, Mofti TH Building construction Estimating is an important process in order to prepare cost estimating for a proposed project. Cost estimate will give client an overview towards the total cost needed to be spent based on design. Due to the importance of the cost estimate for a proposed project, the utilization of computer to prepare cost estimate should therefore be practiced. The entry of computer technology in the estimating practice is a major event in the improvement of the traditional estimating method by reducing estimate preparation time, reducing the amount of paperwork required for the conventional data storage, and improving the quality of documentation. However, the actual use of the computer varies. Some companies use the computer for all projects and others do not use at all. The software are under-utilized due to its inefficiency in terms of difficulty, cost and because the program does not match with the company’s style of estimate This study is intended to identify estimating techniques used by contractors for cost estimate, to identify problem causes using that techniques and to develop a computerized cost estimating system for contractors. The study has found out that most of the contractors were using approximate quantity estimating technique for their cost estimations using computers. However, some of them still prefer to use manual technique as it is easier to apply. Microsoft Excel is the popular software used by contractors to prepare estimate. However, there are disadvantages in using Microsoft Excel is that users have to create suitable format for each estimating work. A computer-aided-project-cost-estimating system has been created to fulfill the needs mentioned. The result of this research was a cost estimating system application named as COES (Cost Estimating System) With the fulfill utilization Microsoft Access 2003 and other Microsoft Access functions, COES has been able to produce cost estimating automatically. This system serves as a systematic framework comprising elements of building works in order to help contractors to prepare a more precise and systematic cost estimate 2006-07 Thesis http://eprints.utm.my/id/eprint/1354/ http://eprints.utm.my/id/eprint/1354/1/MoftiMarjukiMFKA2006.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TH Building construction
spellingShingle TH Building construction
Marjuki, Mofti
Computerised building cost estimating system
description Estimating is an important process in order to prepare cost estimating for a proposed project. Cost estimate will give client an overview towards the total cost needed to be spent based on design. Due to the importance of the cost estimate for a proposed project, the utilization of computer to prepare cost estimate should therefore be practiced. The entry of computer technology in the estimating practice is a major event in the improvement of the traditional estimating method by reducing estimate preparation time, reducing the amount of paperwork required for the conventional data storage, and improving the quality of documentation. However, the actual use of the computer varies. Some companies use the computer for all projects and others do not use at all. The software are under-utilized due to its inefficiency in terms of difficulty, cost and because the program does not match with the company’s style of estimate This study is intended to identify estimating techniques used by contractors for cost estimate, to identify problem causes using that techniques and to develop a computerized cost estimating system for contractors. The study has found out that most of the contractors were using approximate quantity estimating technique for their cost estimations using computers. However, some of them still prefer to use manual technique as it is easier to apply. Microsoft Excel is the popular software used by contractors to prepare estimate. However, there are disadvantages in using Microsoft Excel is that users have to create suitable format for each estimating work. A computer-aided-project-cost-estimating system has been created to fulfill the needs mentioned. The result of this research was a cost estimating system application named as COES (Cost Estimating System) With the fulfill utilization Microsoft Access 2003 and other Microsoft Access functions, COES has been able to produce cost estimating automatically. This system serves as a systematic framework comprising elements of building works in order to help contractors to prepare a more precise and systematic cost estimate
format Thesis
qualification_level Master's degree
author Marjuki, Mofti
author_facet Marjuki, Mofti
author_sort Marjuki, Mofti
title Computerised building cost estimating system
title_short Computerised building cost estimating system
title_full Computerised building cost estimating system
title_fullStr Computerised building cost estimating system
title_full_unstemmed Computerised building cost estimating system
title_sort computerised building cost estimating system
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2006
url http://eprints.utm.my/id/eprint/1354/1/MoftiMarjukiMFKA2006.pdf
_version_ 1747814375430815744