Minimizing variation order on construction project due to design change

There are several issues frequently exist in the process of project implementation in Malaysia. Those issues typically affect the project performance through the occurrence of variation order during the construction phase and resulting in cost overrun and delays in project completion. Nowadays varia...

Full description

Saved in:
Bibliographic Details
Main Author: Hamdan, Hazrin
Format: Thesis
Language:English
Published: 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/1411/1/HazrinHamdanMFKA2012.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.1411
record_format uketd_dc
spelling my-utm-ep.14112018-02-20T04:34:02Z Minimizing variation order on construction project due to design change 2012-01 Hamdan, Hazrin TA Engineering (General). Civil engineering (General) There are several issues frequently exist in the process of project implementation in Malaysia. Those issues typically affect the project performance through the occurrence of variation order during the construction phase and resulting in cost overrun and delays in project completion. Nowadays variation orders become a common phenomenon in our construction industry. Construction projects process known to be complex activities due to critical involvement of many human and non-human factors, time factor, high variability, various uncertainties and also complex relationships among the participants. In some cases, the issues on variation order become worst if both parties i.e. client and contractor have a conflict of understanding which leads to contract disputes and the project might end-up with arbitration, litigation or total abandonment. The objective of this research is to identify the causes of variation order in the construction project. The focus is on the causes which led to the weaknesses of implementation at the pre-construction stage. Further, the impacts to the project performance shall be determined and followed by the strategies to minimize the variation orders. The study process involved the literature review, gathering information from journals, questionnaires survey, analysis, conclusion and recommendation. Relative Importance Index (I) technique analysis is used to rank the identified factors. Based on the above analysis, the results shows that the most significant causes of variation order are design faulty/wrong technical data; duration for design phase too short; and communication breakdown & lack of coordination among consultants. For the most significant impact, the result shows that late completion (extension of time) and cost overrun were the highest rating. While the strategies for minimizing the variation orders based on highest rating was to select the competent & experience consultant company; and also appointment of experience and competent designer. 2012-01 Thesis http://eprints.utm.my/id/eprint/1411/ http://eprints.utm.my/id/eprint/1411/1/HazrinHamdanMFKA2012.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TA Engineering (General)
Civil engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
Hamdan, Hazrin
Minimizing variation order on construction project due to design change
description There are several issues frequently exist in the process of project implementation in Malaysia. Those issues typically affect the project performance through the occurrence of variation order during the construction phase and resulting in cost overrun and delays in project completion. Nowadays variation orders become a common phenomenon in our construction industry. Construction projects process known to be complex activities due to critical involvement of many human and non-human factors, time factor, high variability, various uncertainties and also complex relationships among the participants. In some cases, the issues on variation order become worst if both parties i.e. client and contractor have a conflict of understanding which leads to contract disputes and the project might end-up with arbitration, litigation or total abandonment. The objective of this research is to identify the causes of variation order in the construction project. The focus is on the causes which led to the weaknesses of implementation at the pre-construction stage. Further, the impacts to the project performance shall be determined and followed by the strategies to minimize the variation orders. The study process involved the literature review, gathering information from journals, questionnaires survey, analysis, conclusion and recommendation. Relative Importance Index (I) technique analysis is used to rank the identified factors. Based on the above analysis, the results shows that the most significant causes of variation order are design faulty/wrong technical data; duration for design phase too short; and communication breakdown & lack of coordination among consultants. For the most significant impact, the result shows that late completion (extension of time) and cost overrun were the highest rating. While the strategies for minimizing the variation orders based on highest rating was to select the competent & experience consultant company; and also appointment of experience and competent designer.
format Thesis
qualification_level Master's degree
author Hamdan, Hazrin
author_facet Hamdan, Hazrin
author_sort Hamdan, Hazrin
title Minimizing variation order on construction project due to design change
title_short Minimizing variation order on construction project due to design change
title_full Minimizing variation order on construction project due to design change
title_fullStr Minimizing variation order on construction project due to design change
title_full_unstemmed Minimizing variation order on construction project due to design change
title_sort minimizing variation order on construction project due to design change
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2012
url http://eprints.utm.my/id/eprint/1411/1/HazrinHamdanMFKA2012.pdf
_version_ 1747814376418574336