Adaptation of gateway™ as JKR process review to ensure project success

Malaysia Public Works Department or in Malay, Jabatan Kerja Raya Malaysia (JKR) is the main technical agency that implements building and infrastructure projects for the nation. In the Ninth Malaysian Plan which ended in 2010; JKR implemented more than 7000 projects for government agencies. Not all...

Full description

Saved in:
Bibliographic Details
Main Author: Burhanudin, Noor Ainy
Format: Thesis
Language:English
Published: 2011
Subjects:
Online Access:http://eprints.utm.my/id/eprint/14429/4/NoorAinyBurhanudinMFKA2011.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.14429
record_format uketd_dc
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TA Engineering (General)
Civil engineering (General)
TH Building construction
spellingShingle TA Engineering (General)
Civil engineering (General)
TH Building construction
Burhanudin, Noor Ainy
Adaptation of gateway™ as JKR process review to ensure project success
description Malaysia Public Works Department or in Malay, Jabatan Kerja Raya Malaysia (JKR) is the main technical agency that implements building and infrastructure projects for the nation. In the Ninth Malaysian Plan which ended in 2010; JKR implemented more than 7000 projects for government agencies. Not all of these projects were delivered on time and in some cases, JKR was not getting positive feedback on the finished products from the clients and end users. In preparation for the coming 10th Malaysian Plan, JKR top management has started to strategize on improving their performance and project success. A good process review is necessary to ensure that all activities in the processes of these projects lifecycle can be carried out satisfactorily. Realizing that some processes are more critical than others and have greater impact on the project delivery and success, JKR top management is planning to follow the examples of several government agencies in developed countries that have adopted Gateway ™ to facilitate their project realisations. Gateway ™ is a process review program and software that has been developed by Office of Government Service (OGC) which is an independent office of HM Treasury. This study will evaluate both current work culture in JKR and the project review practices in OCG with the purpose of proposing an adaptation of Gateway ™ review that can assist JKR to ensure project success.
format Thesis
qualification_level Master's degree
author Burhanudin, Noor Ainy
author_facet Burhanudin, Noor Ainy
author_sort Burhanudin, Noor Ainy
title Adaptation of gateway™ as JKR process review to ensure project success
title_short Adaptation of gateway™ as JKR process review to ensure project success
title_full Adaptation of gateway™ as JKR process review to ensure project success
title_fullStr Adaptation of gateway™ as JKR process review to ensure project success
title_full_unstemmed Adaptation of gateway™ as JKR process review to ensure project success
title_sort adaptation of gateway™ as jkr process review to ensure project success
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2011
url http://eprints.utm.my/id/eprint/14429/4/NoorAinyBurhanudinMFKA2011.pdf
_version_ 1747814986568171520
spelling my-utm-ep.144292018-05-27T03:19:57Z Adaptation of gateway™ as JKR process review to ensure project success 2011-05 Burhanudin, Noor Ainy TA Engineering (General). Civil engineering (General) TH Building construction Malaysia Public Works Department or in Malay, Jabatan Kerja Raya Malaysia (JKR) is the main technical agency that implements building and infrastructure projects for the nation. In the Ninth Malaysian Plan which ended in 2010; JKR implemented more than 7000 projects for government agencies. Not all of these projects were delivered on time and in some cases, JKR was not getting positive feedback on the finished products from the clients and end users. In preparation for the coming 10th Malaysian Plan, JKR top management has started to strategize on improving their performance and project success. A good process review is necessary to ensure that all activities in the processes of these projects lifecycle can be carried out satisfactorily. Realizing that some processes are more critical than others and have greater impact on the project delivery and success, JKR top management is planning to follow the examples of several government agencies in developed countries that have adopted Gateway ™ to facilitate their project realisations. Gateway ™ is a process review program and software that has been developed by Office of Government Service (OGC) which is an independent office of HM Treasury. This study will evaluate both current work culture in JKR and the project review practices in OCG with the purpose of proposing an adaptation of Gateway ™ review that can assist JKR to ensure project success. 2011-05 Thesis http://eprints.utm.my/id/eprint/14429/ http://eprints.utm.my/id/eprint/14429/4/NoorAinyBurhanudinMFKA2011.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering Andersen, E.S. and Jessen, S.A. (2000), “Project evaluation scheme”, Project Management, Vol. 6, No.1, pp. 61-9. Baccarini, D. (1999), “The logical framework method for defining project success”, Project Management Journal, Vol. 30 No. 4, pp. 25-32. Boncondin, E.T. 2007, ”Citizen Engagement in Budgeting and Public Accountability”, Paper presented at the 6th Session of the United Nations Committee of Expert on Public Administration, United Nations HQs, New York, 10-14 April. Bonnal, P., Gourc, D. and Lacoste, G. (2002), “The life cycle of technical projects”, Project Management Journal, Vol. 33 No. 1, pp. 12-19. E Erling S. Andersen, David Birchall, Svein Arne Jessen and Arthur H. Money (2006), “Exploring Success Factors”, Baltic Journal of Management, Vol. 1 No. 2, 2006, pp. 127-147. Ezekial, A. C., Olomolaiye, P. O., and Corbett, P. (1998). An Evaluation of Project Needs of UK Building Clients. International Journal of Project Management.16(6), 385-391, Elsevier Science Ltd and IPMA Fusco, J.C. (1997), “Better policies provide the key to implementing project management”, Project Management Journal, Vol. 28 No. 3, pp. 37-43. Hood, C. (1991), “A PUBLIC management for all seasons?”, Public Administration Journal, March 1991, Volume 69 Issue 1, pp. 3-19. Jaafari, A. (2000), “Life-cycle project management: a proposed theoretical model for development and implementation of capital projects”, Project Management Journal, Vol. 31 No. 1, pp. 44-52. JKR Strategic Framework 2007-2010 Kululanga, G.K., Price, A.D. and McCaffer, R. (2002), “Empirical investigation of construction contractors’ organisational learning”, Journal of Construction Engineering and Management, Vol. 128 No. 5, pp. 385-91. Leach, L.P. (1999), “Critical chain project management improves project performance”, Project Management Journal, Vol. 30 No. 2, pp. 39-52. Lidow, D. (1999), “Duck alignment theory: going beyond classic project management to maximize project success”, Project Management Journal, Vol. 30 No. 4, pp. 8-14. Manual Kualiti Sistem Pengurusan Kualiti (SPK) JKR MS ISO 9001-2000. Munns, A.K. and Bjeirmi, B.F. (1996), “The role of project management in achieving success”, International Journal of Project Management, Vol. 14 No. 2, pp. 81-7. Mohd Zaimi Abd Majid and McCaffer, R.(1997), Assessment of Work Performance of Maintenance Contractors in Saudi Arabia, Journal of Management in Engineering. September/Oktober 91. M. Adil Khan and Numayr Chowdhury, “Public Accountability in Differing Governance Situations: Challenges and Options”, The Asia Pacific Journal of Public Administration Vol. 30,No. 1 (June 2008): 15-28. Ofer Zwikael (2009), Critical planning processes in construction projects, Construction Innovation, Emerald Group Publishing Limited, Vol. 9 No. 4, 2009 pp. 372-387. OGC Official Website, Oct. 2010. Roy Mendelsohn (1997) “The constructibility review process: A constructor'sperspective”, Journal of Management in Engineering/ May/June, page 17-19. Saeed, K. (1998), “Towards Sustainable Development: Essays on System Analysis of National Policy”, 2nd ed., Ashgate, Aldershot. Soibelman, L., Liu, L.Y., Kirby, J.G., East, E.W., Caldas, C.H. and Lin, K. (2003), “Design review checking system with corporate lessons learned”, Journal of Construction Engineering and Management, Vol. 129 No. 5, pp. 475-84. Terry Cooke-Davies (2002), “The ‘‘real’’ success factors on projects”, International Journal of Project Management 20, pp.185–190.