Perlaksanaan Sistem Binaan Berindustri (IBS) bagi mengatasi masalah dalam industri pembinaan

Industrialized Building System is a construction method using the technique, products, components and building systems which involve prefabricated components and assembly of components at site. The use of IBS in the construction industry offers many advantages not only in terms of reducing the use o...

Full description

Saved in:
Bibliographic Details
Main Author: Omar, Nur Shahirah
Format: Thesis
Language:English
Published: 2010
Subjects:
Online Access:http://eprints.utm.my/id/eprint/16617/7/NurShahirahOmarMFKSG2010.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.16617
record_format uketd_dc
spelling my-utm-ep.166172017-09-13T04:34:08Z Perlaksanaan Sistem Binaan Berindustri (IBS) bagi mengatasi masalah dalam industri pembinaan 2010 Omar, Nur Shahirah Geoinformation and Real Estate TH Building construction Industrialized Building System is a construction method using the technique, products, components and building systems which involve prefabricated components and assembly of components at site. The use of IBS in the construction industry offers many advantages not only in terms of reducing the use of foreign workers but also to provide a more orderly construction site, clean and safe. In addition, IBS can also reduce wastage of construction materials, the rate of accidents on construction sites as well as to shorten the period of completion of a building. These advantages are not directly solving the problems that exist in the construction industry. However, there are those who still doubt the ability of these IBS applications. Therefore, this study was to identify the use of IBS and conventional methods in the construction of a government project, studying the advantages and disadvantages of the use of IBS in the construction industry and study the problems in the implementation of IBS in the construction industry today. In this study, the authors have selected two schools in Johor, which uses a different method of construction to see more clearly the advantages of this method of IBS. The analysis methods used are qualitative methods and the findings obtained are problems that exist in implementing the use of IBS as a primary method of construction and effective use of IBS compared with the conventional method. Finally, the authors have given some suggestions that can be taken by the CIDB to promote the use of IBS among contractors and developers. 2010 Thesis http://eprints.utm.my/id/eprint/16617/ http://eprints.utm.my/id/eprint/16617/7/NurShahirahOmarMFKSG2010.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Geoinformation and Real Estate Faculty of Geoinformation and Real Estate
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic Geoinformation and Real Estate
TH Building construction
spellingShingle Geoinformation and Real Estate
TH Building construction
Omar, Nur Shahirah
Perlaksanaan Sistem Binaan Berindustri (IBS) bagi mengatasi masalah dalam industri pembinaan
description Industrialized Building System is a construction method using the technique, products, components and building systems which involve prefabricated components and assembly of components at site. The use of IBS in the construction industry offers many advantages not only in terms of reducing the use of foreign workers but also to provide a more orderly construction site, clean and safe. In addition, IBS can also reduce wastage of construction materials, the rate of accidents on construction sites as well as to shorten the period of completion of a building. These advantages are not directly solving the problems that exist in the construction industry. However, there are those who still doubt the ability of these IBS applications. Therefore, this study was to identify the use of IBS and conventional methods in the construction of a government project, studying the advantages and disadvantages of the use of IBS in the construction industry and study the problems in the implementation of IBS in the construction industry today. In this study, the authors have selected two schools in Johor, which uses a different method of construction to see more clearly the advantages of this method of IBS. The analysis methods used are qualitative methods and the findings obtained are problems that exist in implementing the use of IBS as a primary method of construction and effective use of IBS compared with the conventional method. Finally, the authors have given some suggestions that can be taken by the CIDB to promote the use of IBS among contractors and developers.
format Thesis
qualification_level Master's degree
author Omar, Nur Shahirah
author_facet Omar, Nur Shahirah
author_sort Omar, Nur Shahirah
title Perlaksanaan Sistem Binaan Berindustri (IBS) bagi mengatasi masalah dalam industri pembinaan
title_short Perlaksanaan Sistem Binaan Berindustri (IBS) bagi mengatasi masalah dalam industri pembinaan
title_full Perlaksanaan Sistem Binaan Berindustri (IBS) bagi mengatasi masalah dalam industri pembinaan
title_fullStr Perlaksanaan Sistem Binaan Berindustri (IBS) bagi mengatasi masalah dalam industri pembinaan
title_full_unstemmed Perlaksanaan Sistem Binaan Berindustri (IBS) bagi mengatasi masalah dalam industri pembinaan
title_sort perlaksanaan sistem binaan berindustri (ibs) bagi mengatasi masalah dalam industri pembinaan
granting_institution Universiti Teknologi Malaysia, Faculty of Geoinformation and Real Estate
granting_department Faculty of Geoinformation and Real Estate
publishDate 2010
url http://eprints.utm.my/id/eprint/16617/7/NurShahirahOmarMFKSG2010.pdf
_version_ 1747815086567718912