Pemulihan projek perumahan terbengkalai di Selangor dan cara mengatasinya

Project rehabilitation is one of the solutions for the problem of abandoned housing project. Area of study for this research was only focused on the rehabilitation of abandoned housing project by SPNB which more emphasized on the data collection at preliminary stage. This is because; failure of t...

Full description

Saved in:
Bibliographic Details
Main Author: Chan, Ching Yeng
Format: Thesis
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/id/eprint/17916/1/ChanChingYengMFGHT2006.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.17916
record_format uketd_dc
spelling my-utm-ep.179162017-10-12T05:04:02Z Pemulihan projek perumahan terbengkalai di Selangor dan cara mengatasinya 2006 Chan, Ching Yeng TH Building construction Project rehabilitation is one of the solutions for the problem of abandoned housing project. Area of study for this research was only focused on the rehabilitation of abandoned housing project by SPNB which more emphasized on the data collection at preliminary stage. This is because; failure of this works will effect the preliminary study process and cause the project to be out from SPNB action. Therefore, this research is aim to study what kind of data collection problem faced by SPNB and how to solve the problems. Method of face to face interview was used to collect primary sources from SPNB executive who placed in project division. Beside that, method of interview by phone was used to collect other primary sources not only from SPNB executive who placed in project division, but also from developers who involve in case study. The rehabilitation project in Selangor which in preliminary stage was choose as case study in this research. However, method of qualitative analysis was used to analyze the primary sources in this study. In short, the analysis result indicate that, SPNB was facing four problems when collecting data in preliminary stage which include problem of developer cooperation, incomplete data from agency involve, unsuitable information form method and legal power problem. These problems not only removed the project out of SPNB rehabilitation action, it also can effect the time which needed to complete the project. Therefore, some of the solution such as campaign realization was suggested to help SPNB overcome these problems. These suggestions not only will help SPNB to smooth the rehabilitation process, but also will help to prevent the project removed from SPNB rehabilitation action 2006 Thesis http://eprints.utm.my/id/eprint/17916/ http://eprints.utm.my/id/eprint/17916/1/ChanChingYengMFGHT2006.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:61881?queryType=vitalDismax&query=Pemulihan+projek+perumahan+terbengkalai+di+Selangor+dan+cara+mengatasinya&public=true masters Universiti Teknologi Malaysia, Faculty of Geoinformation Science And Engineering Faculty of Geoinformation Science And Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TH Building construction
spellingShingle TH Building construction
Chan, Ching Yeng
Pemulihan projek perumahan terbengkalai di Selangor dan cara mengatasinya
description Project rehabilitation is one of the solutions for the problem of abandoned housing project. Area of study for this research was only focused on the rehabilitation of abandoned housing project by SPNB which more emphasized on the data collection at preliminary stage. This is because; failure of this works will effect the preliminary study process and cause the project to be out from SPNB action. Therefore, this research is aim to study what kind of data collection problem faced by SPNB and how to solve the problems. Method of face to face interview was used to collect primary sources from SPNB executive who placed in project division. Beside that, method of interview by phone was used to collect other primary sources not only from SPNB executive who placed in project division, but also from developers who involve in case study. The rehabilitation project in Selangor which in preliminary stage was choose as case study in this research. However, method of qualitative analysis was used to analyze the primary sources in this study. In short, the analysis result indicate that, SPNB was facing four problems when collecting data in preliminary stage which include problem of developer cooperation, incomplete data from agency involve, unsuitable information form method and legal power problem. These problems not only removed the project out of SPNB rehabilitation action, it also can effect the time which needed to complete the project. Therefore, some of the solution such as campaign realization was suggested to help SPNB overcome these problems. These suggestions not only will help SPNB to smooth the rehabilitation process, but also will help to prevent the project removed from SPNB rehabilitation action
format Thesis
qualification_level Master's degree
author Chan, Ching Yeng
author_facet Chan, Ching Yeng
author_sort Chan, Ching Yeng
title Pemulihan projek perumahan terbengkalai di Selangor dan cara mengatasinya
title_short Pemulihan projek perumahan terbengkalai di Selangor dan cara mengatasinya
title_full Pemulihan projek perumahan terbengkalai di Selangor dan cara mengatasinya
title_fullStr Pemulihan projek perumahan terbengkalai di Selangor dan cara mengatasinya
title_full_unstemmed Pemulihan projek perumahan terbengkalai di Selangor dan cara mengatasinya
title_sort pemulihan projek perumahan terbengkalai di selangor dan cara mengatasinya
granting_institution Universiti Teknologi Malaysia, Faculty of Geoinformation Science And Engineering
granting_department Faculty of Geoinformation Science And Engineering
publishDate 2006
url http://eprints.utm.my/id/eprint/17916/1/ChanChingYengMFGHT2006.pdf
_version_ 1747815148076138496