Force majeure in extension of time
Time is extremely important issue in construction. Most of construction contract specify time to complete the construction work. However, during the execution of the contract, circumstances may arise and leads to delay. In circumstances that delay occurs, the employer is entitled to claim for damage...
Saved in:
Main Author: | Sanis, Kathleen |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/18024/1/KathleenSanisMFAB2008.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Force majeure events in construction industry
by: Koo, Zhong Yee
Published: (2022) -
Social Forces and Electoral Change in Sarawak: A Case Study of Five Social Forces
by: Chua, Wey Lin
Published: (2017) -
Force majeure in building contract : a comparative study of Saudi Arabia and Malaysia /
by: Ahmad, Albarak Hada
Published: (2012) -
Applicability of force majeure clause in construction contract in Malaysia
by: Abdollah, Sofiah
Published: (2010) -
Identifying factors that influence the patronage intention of Muslims and nonmuslims in Malaysia at Kopitiam: An extension of theory of planned behaviour
by: Koh, Yong Sieng
Published: (2013)