Main contractor's entitlement to an extension of time due to concurrent delay
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Published: |
2008
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-utm-ep.18062 |
---|---|
record_format |
uketd_dc |
spelling |
my-utm-ep.180622011-11-18T04:31:03Z Main contractor's entitlement to an extension of time due to concurrent delay 2008-00 Othman, Airennizah Unspecified 2008-00 Thesis http://eprints.utm.my/id/eprint/18062/ masters Universiti Teknologi Malaysia, Faculty of Built Environment Faculty of Built Environment |
institution |
Universiti Teknologi Malaysia |
collection |
UTM Institutional Repository |
topic |
Unspecified |
spellingShingle |
Unspecified Othman, Airennizah Main contractor's entitlement to an extension of time due to concurrent delay |
description |
|
format |
Thesis |
qualification_level |
Master's degree |
author |
Othman, Airennizah |
author_facet |
Othman, Airennizah |
author_sort |
Othman, Airennizah |
title |
Main contractor's entitlement to an extension of time due to concurrent delay |
title_short |
Main contractor's entitlement to an extension of time due to concurrent delay |
title_full |
Main contractor's entitlement to an extension of time due to concurrent delay |
title_fullStr |
Main contractor's entitlement to an extension of time due to concurrent delay |
title_full_unstemmed |
Main contractor's entitlement to an extension of time due to concurrent delay |
title_sort |
main contractor's entitlement to an extension of time due to concurrent delay |
granting_institution |
Universiti Teknologi Malaysia, Faculty of Built Environment |
granting_department |
Faculty of Built Environment |
publishDate |
2008 |
_version_ |
1747815183457189888 |