Contractor's right to claim for extra works

Saved in:
Bibliographic Details
Main Author: Yap, Chiaw Guan
Format: Thesis
Published: 2009
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.18211
record_format uketd_dc
spelling my-utm-ep.182112011-11-18T04:32:16Z Contractor's right to claim for extra works 2009-00 Yap, Chiaw Guan Unspecified 2009-00 Thesis http://eprints.utm.my/id/eprint/18211/ masters Universiti Teknologi Malaysia, Faculty of Built Environment Faculty of Built Environment
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
topic Unspecified
spellingShingle Unspecified
Yap, Chiaw Guan
Contractor's right to claim for extra works
description
format Thesis
qualification_level Master's degree
author Yap, Chiaw Guan
author_facet Yap, Chiaw Guan
author_sort Yap, Chiaw Guan
title Contractor's right to claim for extra works
title_short Contractor's right to claim for extra works
title_full Contractor's right to claim for extra works
title_fullStr Contractor's right to claim for extra works
title_full_unstemmed Contractor's right to claim for extra works
title_sort contractor's right to claim for extra works
granting_institution Universiti Teknologi Malaysia, Faculty of Built Environment
granting_department Faculty of Built Environment
publishDate 2009
_version_ 1747815219767279616