Schedulling simulation for high-rise building comparison on time impact
محفوظ في:
المؤلف الرئيسي: | |
---|---|
التنسيق: | أطروحة |
منشور في: |
2009
|
الموضوعات: | |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
id |
my-utm-ep.18522 |
---|---|
record_format |
uketd_dc |
spelling |
my-utm-ep.185222011-11-18T04:34:57Z Schedulling simulation for high-rise building comparison on time impact 2009-00 Ismail, Asmadi TA Engineering (General). Civil engineering (General) 2009-00 Thesis http://eprints.utm.my/id/eprint/18522/ masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering |
institution |
Universiti Teknologi Malaysia |
collection |
UTM Institutional Repository |
topic |
TA Engineering (General) Civil engineering (General) |
spellingShingle |
TA Engineering (General) Civil engineering (General) Ismail, Asmadi Schedulling simulation for high-rise building comparison on time impact |
description |
|
format |
Thesis |
qualification_level |
Master's degree |
author |
Ismail, Asmadi |
author_facet |
Ismail, Asmadi |
author_sort |
Ismail, Asmadi |
title |
Schedulling simulation for high-rise building comparison on time impact |
title_short |
Schedulling simulation for high-rise building comparison on time impact |
title_full |
Schedulling simulation for high-rise building comparison on time impact |
title_fullStr |
Schedulling simulation for high-rise building comparison on time impact |
title_full_unstemmed |
Schedulling simulation for high-rise building comparison on time impact |
title_sort |
schedulling simulation for high-rise building comparison on time impact |
granting_institution |
Universiti Teknologi Malaysia, Faculty of Civil Engineering |
granting_department |
Faculty of Civil Engineering |
publishDate |
2009 |
_version_ |
1747815295302500352 |