Schedulling simulation for high-rise building comparison on time impact
Saved in:
Main Author: | Ismail, Asmadi |
---|---|
Format: | Thesis |
Published: |
2009
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Fire safety in high rise residential building in Malaysia
by: Hashemian, Seyed Mohammad
Published: (2014) -
High rise building movement monitoring using RTK-GPS (case study: Menara Sarawak Enterprise)
by: Shu, Kian Kok
Published: (2005) -
Multi-criteria decision framework for seismic retrofitting of low-rise buildings
by: Pashaei, Reza
Published: (2014) -
The study of problems faced by property management in managing the high rise condominium in Malaysia
by: Abd. Latif Azmi, Noraziah Azmin
Published: (2006) -
Feasibility study on the implementation of medium rise industrialized building system (IBS) in Aleskan Alshaabi project in Khartoum
by: Elageb Adaam, Alaadein Abdusalam
Published: (2012)