Mengenal pasti sebab kelewatan kelulusan proses pra-pembangunan tanah (Tukar syarat dan pecah sempadan) dan cara mengatasinya

There are lots of problems relating to the delay of approval of conversion and sub division of land in Malaysia. In 1983 YAB Deputy Prime Minister, Datuk Musa Hitam had complained about the delay and proposed the approval for conversion and sub division to be within six months. Theses issues appeare...

Full description

Saved in:
Bibliographic Details
Main Author: Kasim, A. Bakar
Format: Thesis
Language:English
Published: 2003
Subjects:
Online Access:http://eprints.utm.my/id/eprint/19082/1/ABakarKasimMFKSG2003.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.19082
record_format uketd_dc
spelling my-utm-ep.190822017-10-10T06:55:43Z Mengenal pasti sebab kelewatan kelulusan proses pra-pembangunan tanah (Tukar syarat dan pecah sempadan) dan cara mengatasinya 2003 Kasim, A. Bakar Unspecified There are lots of problems relating to the delay of approval of conversion and sub division of land in Malaysia. In 1983 YAB Deputy Prime Minister, Datuk Musa Hitam had complained about the delay and proposed the approval for conversion and sub division to be within six months. Theses issues appeared again in local newspapers from December 2002 until June 2003 and the writer took the responsibility to study tyhe reason for the delay. It is recommended that the procedures for the approval should be amended to suite the present requirement and steps should be taken to study how developed country solve the problems of delay. 2003 Thesis http://eprints.utm.my/id/eprint/19082/ http://eprints.utm.my/id/eprint/19082/1/ABakarKasimMFKSG2003.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:61250?queryType=vitalDismax&query=Mengenal+pasti+sebab+kelewatan+kelulusan+proses+pra-pembangunan+tanah&public=true masters Universiti Teknologi Malaysia, Faculty of Geoinformation Science And Engineering Faculty of Geoinformation Science And Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic Unspecified
spellingShingle Unspecified
Kasim, A. Bakar
Mengenal pasti sebab kelewatan kelulusan proses pra-pembangunan tanah (Tukar syarat dan pecah sempadan) dan cara mengatasinya
description There are lots of problems relating to the delay of approval of conversion and sub division of land in Malaysia. In 1983 YAB Deputy Prime Minister, Datuk Musa Hitam had complained about the delay and proposed the approval for conversion and sub division to be within six months. Theses issues appeared again in local newspapers from December 2002 until June 2003 and the writer took the responsibility to study tyhe reason for the delay. It is recommended that the procedures for the approval should be amended to suite the present requirement and steps should be taken to study how developed country solve the problems of delay.
format Thesis
qualification_level Master's degree
author Kasim, A. Bakar
author_facet Kasim, A. Bakar
author_sort Kasim, A. Bakar
title Mengenal pasti sebab kelewatan kelulusan proses pra-pembangunan tanah (Tukar syarat dan pecah sempadan) dan cara mengatasinya
title_short Mengenal pasti sebab kelewatan kelulusan proses pra-pembangunan tanah (Tukar syarat dan pecah sempadan) dan cara mengatasinya
title_full Mengenal pasti sebab kelewatan kelulusan proses pra-pembangunan tanah (Tukar syarat dan pecah sempadan) dan cara mengatasinya
title_fullStr Mengenal pasti sebab kelewatan kelulusan proses pra-pembangunan tanah (Tukar syarat dan pecah sempadan) dan cara mengatasinya
title_full_unstemmed Mengenal pasti sebab kelewatan kelulusan proses pra-pembangunan tanah (Tukar syarat dan pecah sempadan) dan cara mengatasinya
title_sort mengenal pasti sebab kelewatan kelulusan proses pra-pembangunan tanah (tukar syarat dan pecah sempadan) dan cara mengatasinya
granting_institution Universiti Teknologi Malaysia, Faculty of Geoinformation Science And Engineering
granting_department Faculty of Geoinformation Science And Engineering
publishDate 2003
url http://eprints.utm.my/id/eprint/19082/1/ABakarKasimMFKSG2003.pdf
_version_ 1747815377005445120