Petroleum terminal's operation processes on vessel turnaround time
Saved in:
Main Author: | Ng, Siew Ming |
---|---|
Format: | Thesis |
Published: |
2009
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The delay in the first lift from vessel alongside and the effect on overall vessel gross productivity
by: Murugiah, Navinder
Published: (2009) -
Strategies to improve berth turnaround time of mainline container ships calling at Port Klang : case study : Klang Container Terminal (KCT)
by: Krishnan, K. Surendran Kutty
Published: (1996) -
Corporate turnaround : a review and case study /
by: Siew, Chee Meng
Published: (1990) -
Termination of contract by contractor
by: Borhanudin, Noor Hasiken
Published: (2008) -
The profile of construction contract termination cases
by: Rosly, Roslinda
Published: (2009)