Variation orders in Universiti Teknologi Malaysia (UTM) construction projects

The project holder have to believe that no construction method or for that matter the project, is free of variation and it’s afterward activity of claims. A document review was done for 18 numbers of construction contract documentation projects in Universiti Teknologi Malaysia (UTM) during the per...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلف الرئيسي: Ibrahim, Nor Hayati
التنسيق: أطروحة
اللغة:English
منشور في: 2006
الموضوعات:
الوصول للمادة أونلاين:http://eprints.utm.my/id/eprint/2079/1/NorHayatiIbrahimMFKA2006.pdf
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
id my-utm-ep.2079
record_format uketd_dc
spelling my-utm-ep.20792018-06-13T07:05:25Z Variation orders in Universiti Teknologi Malaysia (UTM) construction projects 2006-11 Ibrahim, Nor Hayati TA Engineering (General). Civil engineering (General) The project holder have to believe that no construction method or for that matter the project, is free of variation and it’s afterward activity of claims. A document review was done for 18 numbers of construction contract documentation projects in Universiti Teknologi Malaysia (UTM) during the period of the Seventh Malaysian Plan from 1996 to 2000 with the total value of all projects in the excess RM100 million. The client, consultant and contractor become the main respondent target. In general, UTM’s construction projects of building works, renovation works and infrastructure works during Seventh Malaysian Plan are not impervious to variation orders. Every project of building works an average of RM 2.08 million is expend on variation orders and about RM 0.31 million is spent for every variation orders occurred in renovation and infrastructure works. All these have impacted the cost and the completion time of projects. This study has concluded the most numerous cause of variation orders in UTM construction projects which is inadequate consideration of design. Meanwhile, the top five of the effects of these variation orders are listed as followed; increase in project cost; delay in payment; procurement delay; logistic delay; completion schedule delay. The findings of this study also points out that the involvement of profession in the design phase and continuous coordination and direct communication are the two most considered factors to minimizing the happening of variation orders 2006-11 Thesis http://eprints.utm.my/id/eprint/2079/ http://eprints.utm.my/id/eprint/2079/1/NorHayatiIbrahimMFKA2006.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TA Engineering (General)
Civil engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
Ibrahim, Nor Hayati
Variation orders in Universiti Teknologi Malaysia (UTM) construction projects
description The project holder have to believe that no construction method or for that matter the project, is free of variation and it’s afterward activity of claims. A document review was done for 18 numbers of construction contract documentation projects in Universiti Teknologi Malaysia (UTM) during the period of the Seventh Malaysian Plan from 1996 to 2000 with the total value of all projects in the excess RM100 million. The client, consultant and contractor become the main respondent target. In general, UTM’s construction projects of building works, renovation works and infrastructure works during Seventh Malaysian Plan are not impervious to variation orders. Every project of building works an average of RM 2.08 million is expend on variation orders and about RM 0.31 million is spent for every variation orders occurred in renovation and infrastructure works. All these have impacted the cost and the completion time of projects. This study has concluded the most numerous cause of variation orders in UTM construction projects which is inadequate consideration of design. Meanwhile, the top five of the effects of these variation orders are listed as followed; increase in project cost; delay in payment; procurement delay; logistic delay; completion schedule delay. The findings of this study also points out that the involvement of profession in the design phase and continuous coordination and direct communication are the two most considered factors to minimizing the happening of variation orders
format Thesis
qualification_level Master's degree
author Ibrahim, Nor Hayati
author_facet Ibrahim, Nor Hayati
author_sort Ibrahim, Nor Hayati
title Variation orders in Universiti Teknologi Malaysia (UTM) construction projects
title_short Variation orders in Universiti Teknologi Malaysia (UTM) construction projects
title_full Variation orders in Universiti Teknologi Malaysia (UTM) construction projects
title_fullStr Variation orders in Universiti Teknologi Malaysia (UTM) construction projects
title_full_unstemmed Variation orders in Universiti Teknologi Malaysia (UTM) construction projects
title_sort variation orders in universiti teknologi malaysia (utm) construction projects
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2006
url http://eprints.utm.my/id/eprint/2079/1/NorHayatiIbrahimMFKA2006.pdf
_version_ 1747814397483417600