New Engineering Contract (NEC) 1993 as radical changes to the Malaysian standard forms of contract
The construction industry in Malaysia has been plagued by the rising of claims, disputes and litigation. Design and bidding documents are seldom adequately complete prior to the tendering exercise. Hence, tender documents and conditions of contracts were tinkered in an amateurish way loading substan...
Saved in:
Main Author: | Chan, Melissa Yuet Li |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/2380/1/MelissaChanYuetLimMFAB2006.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Evaluation on PWD 75, standard form of general conditions of contract in Sarawak
by: Sia, Pik Soon
Published: (2008) -
Breaches of contract in construction industry
by: Yap, Lawrence Sie Kiong
Published: (2009) -
The new payment clauses in the PWD 203/203A (REV. 1/2010) conditions of contract in aligning to CIPAA
by: Ahmad, Hasnita
Published: (2015) -
Judicial interpretations of the term ‘Lump Sum’ in construction contract
by: Mohamad Ali, Norwati
Published: (2009) -
Settlement of administrative contract disputes in international commercial arbitration
by: Al-Ali, Khalfan Mater Khalfan Aljabry
Published: (2023)