Time essence and termination in construction contract
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Published: |
2009
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-utm-ep.24521 |
---|---|
record_format |
uketd_dc |
spelling |
my-utm-ep.245212014-01-01T03:34:44Z Time essence and termination in construction contract 2009 Liew, Li Ming TH Building construction 2009 Thesis http://eprints.utm.my/id/eprint/24521/ masters Universiti Teknologi Malaysia, Faculty of Built Environment Faculty of Built Environment |
institution |
Universiti Teknologi Malaysia |
collection |
UTM Institutional Repository |
topic |
TH Building construction |
spellingShingle |
TH Building construction Liew, Li Ming Time essence and termination in construction contract |
description |
|
format |
Thesis |
qualification_level |
Master's degree |
author |
Liew, Li Ming |
author_facet |
Liew, Li Ming |
author_sort |
Liew, Li Ming |
title |
Time essence and termination in construction contract
|
title_short |
Time essence and termination in construction contract
|
title_full |
Time essence and termination in construction contract
|
title_fullStr |
Time essence and termination in construction contract
|
title_full_unstemmed |
Time essence and termination in construction contract
|
title_sort |
time essence and termination in construction contract |
granting_institution |
Universiti Teknologi Malaysia, Faculty of Built Environment |
granting_department |
Faculty of Built Environment |
publishDate |
2009 |
_version_ |
1747815428533518336 |