Productivity of rendering and tiling works for building projects scheduling
Saved in:
Main Author: | Mohd. Zain, Resli Azha |
---|---|
Format: | Thesis |
Published: |
2011
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Productivity of concreting work in Jabatan Kerja Raya building projects
by: Osman, Arnita Sofia
Published: (2011) -
Combination of linear and gradient vector flow field digital mosaic rendering for automated tile placement
by: Akindokun, Tolulope John
Published: (2018) -
Gas turbin cogeneration system : a study on the performance in the ceramic tile industry
by: Abd. Rahim, Surani
Published: (2000) -
Building time comparison between conventional and industrialized building system using schedule simulation
by: Tahmasebi, Mohammad Mahdi
Published: (2012) -
Evaluation on current practice in work breakdown structure approach for construction schedules
by: Md. Isha, Mohd. Nasir
Published: (2005)