Scheduling software as a tool for monitoring and controlling JKR project
Monitoring and controlling project progress is an important role of a project manager. Knowing when and how to intervene underperform project is critical to the overall health of any organization. There are problem faced by many construction player in monitoring and controlling project which lead to...
محفوظ في:
المؤلف الرئيسي: | |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2011
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/26380/1/ZainalAbidinSinMFKA2011.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
id |
my-utm-ep.26380 |
---|---|
record_format |
uketd_dc |
spelling |
my-utm-ep.263802018-05-27T03:30:41Z Scheduling software as a tool for monitoring and controlling JKR project 2011-05 Sin, Zainal Abidin TA Engineering (General). Civil engineering (General) Monitoring and controlling project progress is an important role of a project manager. Knowing when and how to intervene underperform project is critical to the overall health of any organization. There are problem faced by many construction player in monitoring and controlling project which lead to low quality of works. Thus in order to enhance effectiveness of monitoring and controlling project, JKR has to use planning and scheduling software and identify the importance features to be incorporated. Even though JKR has implemented scheduling software in their projects but the monitoring and controlling still far from the expectation result. The focus of this study is to investigate scheduling software as an effective tool for monitoring and controlling project at JKR and limited to Microsoft Project software. This was due to the high of percentage of user for this software as compared to other software in JKR. The scope of the study includes identifying aspects of the important features in the software planning / scheduling of projects related to monitoring and controlling in JKR. It also includes an assessment of the effectiveness of these items that are available in Microsoft Project for project monitoring and controlling, further to establish project monitoring and controlling guideline for JKR practice. Data were collected using mixed method approach including document search, interview expert panel and questionnaire survey to evaluate current practice of management and project team. Data were analyzed using Statistical Package for Social Science (SPSS). Conclusion from this study, level of competency of user just grade “Good” and need more improvement. The finding of this study will facilitate JKR with monitoring and controlling guideline of the projects and the quality of products and services delivered to the client are perceived clients’ expectation and satisfaction. 2011-05 Thesis http://eprints.utm.my/id/eprint/26380/ http://eprints.utm.my/id/eprint/26380/1/ZainalAbidinSinMFKA2011.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:72647?site_name=Restricted Repository masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering |
institution |
Universiti Teknologi Malaysia |
collection |
UTM Institutional Repository |
language |
English |
topic |
TA Engineering (General) Civil engineering (General) |
spellingShingle |
TA Engineering (General) Civil engineering (General) Sin, Zainal Abidin Scheduling software as a tool for monitoring and controlling JKR project |
description |
Monitoring and controlling project progress is an important role of a project manager. Knowing when and how to intervene underperform project is critical to the overall health of any organization. There are problem faced by many construction player in monitoring and controlling project which lead to low quality of works. Thus in order to enhance effectiveness of monitoring and controlling project, JKR has to use planning and scheduling software and identify the importance features to be incorporated. Even though JKR has implemented scheduling software in their projects but the monitoring and controlling still far from the expectation result. The focus of this study is to investigate scheduling software as an effective tool for monitoring and controlling project at JKR and limited to Microsoft Project software. This was due to the high of percentage of user for this software as compared to other software in JKR. The scope of the study includes identifying aspects of the important features in the software planning / scheduling of projects related to monitoring and controlling in JKR. It also includes an assessment of the effectiveness of these items that are available in Microsoft Project for project monitoring and controlling, further to establish project monitoring and controlling guideline for JKR practice. Data were collected using mixed method approach including document search, interview expert panel and questionnaire survey to evaluate current practice of management and project team. Data were analyzed using Statistical Package for Social Science (SPSS). Conclusion from this study, level of competency of user just grade “Good” and need more improvement. The finding of this study will facilitate JKR with monitoring and controlling guideline of the projects and the quality of products and services delivered to the client are perceived clients’ expectation and satisfaction. |
format |
Thesis |
qualification_level |
Master's degree |
author |
Sin, Zainal Abidin |
author_facet |
Sin, Zainal Abidin |
author_sort |
Sin, Zainal Abidin |
title |
Scheduling software as a tool for monitoring and controlling JKR project |
title_short |
Scheduling software as a tool for monitoring and controlling JKR project |
title_full |
Scheduling software as a tool for monitoring and controlling JKR project |
title_fullStr |
Scheduling software as a tool for monitoring and controlling JKR project |
title_full_unstemmed |
Scheduling software as a tool for monitoring and controlling JKR project |
title_sort |
scheduling software as a tool for monitoring and controlling jkr project |
granting_institution |
Universiti Teknologi Malaysia, Faculty of Civil Engineering |
granting_department |
Faculty of Civil Engineering |
publishDate |
2011 |
url |
http://eprints.utm.my/id/eprint/26380/1/ZainalAbidinSinMFKA2011.pdf |
_version_ |
1747815462310248448 |