Minimizing delay in construction projects in Tehran, Iran

Construction industry is one of the most profitable sectors in Iran’s economic. Delay is common problem in the construction projects in Iran. This research, by considering the main causes of delay, prepared appropriate suggestions to minimize delay in construction projects in Tehran (Capital of Iran...

Full description

Saved in:
Bibliographic Details
Main Author: Rafieizonooz, Mahdi
Format: Thesis
Language:English
Published: 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/29897/1/MahdiRafieizonoozMFKA2012.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.29897
record_format uketd_dc
spelling my-utm-ep.298972018-05-27T07:08:04Z Minimizing delay in construction projects in Tehran, Iran 2012-01 Rafieizonooz, Mahdi TA Engineering (General). Civil engineering (General) Construction industry is one of the most profitable sectors in Iran’s economic. Delay is common problem in the construction projects in Iran. This research, by considering the main causes of delay, prepared appropriate suggestions to minimize delay in construction projects in Tehran (Capital of Iran). Literature review provided up to date information with current literature and based on reviewing past publications. The questionnaires were distributed among respondents who are involved in the construction project in Tehran, Iran. The process of data analysis and discussions were conducted based on the questionnaire survey to identify the frequency of occurrence and severity affect of delay as well as findings the most effective methods of minimizing delay in Tehran’s construction projects. As a result of this study, respondents believe that ‘Delay in payment to contractor’ by client, ‘Difficulties in financing’ by contractor, ‘Slowness in decision making’ by client and ‘Poor site management’ by contractor are the most frequent and severe causes of delay in Tehran construction projects. Moreover the negative effects of delay on construction projects are: Cost Overrun, Change in Schedule and Liquidated Damage. Furthermore, the most effectiveness methods of minimizing delay are as follows: Pay progress payment to the contractor on time’ by client, ‘Accurate initial cost and time estimates’ by client and contractor, ‘Competent personnel of contractor / sub-contractor’ by contractor. Finally and based on the findings of this research, there were some recommendation to minimize the rate of delay in construction project in Tehran. 2012-01 Thesis http://eprints.utm.my/id/eprint/29897/ http://eprints.utm.my/id/eprint/29897/1/MahdiRafieizonoozMFKA2012.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TA Engineering (General)
Civil engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
Rafieizonooz, Mahdi
Minimizing delay in construction projects in Tehran, Iran
description Construction industry is one of the most profitable sectors in Iran’s economic. Delay is common problem in the construction projects in Iran. This research, by considering the main causes of delay, prepared appropriate suggestions to minimize delay in construction projects in Tehran (Capital of Iran). Literature review provided up to date information with current literature and based on reviewing past publications. The questionnaires were distributed among respondents who are involved in the construction project in Tehran, Iran. The process of data analysis and discussions were conducted based on the questionnaire survey to identify the frequency of occurrence and severity affect of delay as well as findings the most effective methods of minimizing delay in Tehran’s construction projects. As a result of this study, respondents believe that ‘Delay in payment to contractor’ by client, ‘Difficulties in financing’ by contractor, ‘Slowness in decision making’ by client and ‘Poor site management’ by contractor are the most frequent and severe causes of delay in Tehran construction projects. Moreover the negative effects of delay on construction projects are: Cost Overrun, Change in Schedule and Liquidated Damage. Furthermore, the most effectiveness methods of minimizing delay are as follows: Pay progress payment to the contractor on time’ by client, ‘Accurate initial cost and time estimates’ by client and contractor, ‘Competent personnel of contractor / sub-contractor’ by contractor. Finally and based on the findings of this research, there were some recommendation to minimize the rate of delay in construction project in Tehran.
format Thesis
qualification_level Master's degree
author Rafieizonooz, Mahdi
author_facet Rafieizonooz, Mahdi
author_sort Rafieizonooz, Mahdi
title Minimizing delay in construction projects in Tehran, Iran
title_short Minimizing delay in construction projects in Tehran, Iran
title_full Minimizing delay in construction projects in Tehran, Iran
title_fullStr Minimizing delay in construction projects in Tehran, Iran
title_full_unstemmed Minimizing delay in construction projects in Tehran, Iran
title_sort minimizing delay in construction projects in tehran, iran
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2012
url http://eprints.utm.my/id/eprint/29897/1/MahdiRafieizonoozMFKA2012.pdf
_version_ 1747815706850754560