Bavafa, A. A. (2012). Evaluation of construction time performance and waste time reduction by utilizing lean paradigm.
Chicago Style (17th ed.) CitationBavafa, Ali Asghar. Evaluation of Construction Time Performance and Waste Time Reduction by Utilizing Lean Paradigm. 2012.
MLA (8th ed.) CitationBavafa, Ali Asghar. Evaluation of Construction Time Performance and Waste Time Reduction by Utilizing Lean Paradigm. 2012.
Warning: These citations may not always be 100% accurate.