The challenges in implementing incentive based contract in Jabatan Kerja Raya project
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Published: |
2012
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-utm-ep.31570 |
---|---|
record_format |
uketd_dc |
spelling |
my-utm-ep.315702013-05-07T03:28:34Z The challenges in implementing incentive based contract in Jabatan Kerja Raya project 2012-00 Haryati Amzah, Nurrul Hudha Unspecified 2012-00 Thesis http://eprints.utm.my/id/eprint/31570/ masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering |
institution |
Universiti Teknologi Malaysia |
collection |
UTM Institutional Repository |
topic |
Unspecified |
spellingShingle |
Unspecified Haryati Amzah, Nurrul Hudha The challenges in implementing incentive based contract in Jabatan Kerja Raya project |
description |
|
format |
Thesis |
qualification_level |
Master's degree |
author |
Haryati Amzah, Nurrul Hudha |
author_facet |
Haryati Amzah, Nurrul Hudha |
author_sort |
Haryati Amzah, Nurrul Hudha |
title |
The challenges in implementing incentive based contract in Jabatan Kerja Raya project |
title_short |
The challenges in implementing incentive based contract in Jabatan Kerja Raya project |
title_full |
The challenges in implementing incentive based contract in Jabatan Kerja Raya project |
title_fullStr |
The challenges in implementing incentive based contract in Jabatan Kerja Raya project |
title_full_unstemmed |
The challenges in implementing incentive based contract in Jabatan Kerja Raya project |
title_sort |
challenges in implementing incentive based contract in jabatan kerja raya project |
granting_institution |
Universiti Teknologi Malaysia, Faculty of Civil Engineering |
granting_department |
Faculty of Civil Engineering |
publishDate |
2012 |
_version_ |
1747815836005957632 |