Time and budget overrun in the construction of town houses in Dubai U.A.E
A construction contract normally have the duration for projects start date and finish date provided by the Client to the Contractor to finish the work. If the contractor is unable to finish the work within a specified finish date, then the Client has the right under a construction contract to impose...
Saved in:
主要作者: | Shaikh, Abdul Wahab |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2012
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/32135/5/AbdulWahabShaikhMFKA2012.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Structural modelling of cost overrun factors in construction industry
由: Memon, Aftab Hameed
出版: (2013) -
Improvement measures of cost overruns in residential construction project in Malaysia
由: Rahim, Nur Syafika Artika
出版: (2020) -
Construction bid model for residential building projects in Dubai
由: Al Janabi, Tamadhur H. F.
出版: (2018) -
Safety budgeting cost for construction project
由: Abd. Latib, Firdaus
出版: (2014) -
Effective strategies dealing with construction cost overruns: a study in Jordan
由: Faten, Ahmad Al-Btoush
出版: (2021)