Masalah kontraktor dorman yang berdaftar di Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB)

The contractors must register with the Construction Industry Development Board (CIDB) before they are allowed to carry out of construction works. The statistics of registration of contractors at CIDB until June 2011 showed 62,811 contractors. However, the total of contractors did not awarded tender...

Full description

Saved in:
Bibliographic Details
Main Author: Ismail, Asmah Munajah
Format: Thesis
Language:English
Published: 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/32263/1/AsmahMunajahIsmailMFKA2012.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.32263
record_format uketd_dc
spelling my-utm-ep.322632020-11-09T06:23:10Z Masalah kontraktor dorman yang berdaftar di Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB) 2012 Ismail, Asmah Munajah Unspecified The contractors must register with the Construction Industry Development Board (CIDB) before they are allowed to carry out of construction works. The statistics of registration of contractors at CIDB until June 2011 showed 62,811 contractors. However, the total of contractors did not awarded tender also high especially in the dormant category. The total of dormant contractor for 2011 was 5,539 contractors. The objectives of this study are to identify the factor that contractors being dormant from the viewpoint of the CIDB, to identify the factor that contractors being dormant from the viewpoint of the contractor, to identify the business diversification carried out by the dormant contractors and to identify the action to CIDB taken towards dormant contractors. The study is carried out in Johor Bahru. Data is collected through questionnaires and interviews. A total of 114 questionnaires are distributed to the respondents comprising of contractors, clients and CIDB. The data is analyzed using Average Index. From the study, the factors that contributed to the contractor being dormant from the viewpoint of CIDB are inadequate experience in construction, limited skill, inadequate financial resources, unwilling to take risk and the type of project. Thereof, the factors that contributed to the contractor being dormant from the viewpoint of the contractor are inadequate financial resources, failure getting the load, high cost of overhead, stiff of competition, and high price of document tender. The business diversifications of dormant contractors are service business and farming or agriculture. And the result from last objective showed the best action can be taken by CIDB to reduce total of dormant contractor is provide the incentive training to them. 2012 Thesis http://eprints.utm.my/id/eprint/32263/ http://eprints.utm.my/id/eprint/32263/1/AsmahMunajahIsmailMFKA2012.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository?query=Masalah+kontraktor+dorman+yang+berdaftar+di+Lembaga+Pembangunan+Industri+Pembinaan+Malaysia+%28CIDB%29&queryType=vitalDismax&public=true masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic Unspecified
spellingShingle Unspecified
Ismail, Asmah Munajah
Masalah kontraktor dorman yang berdaftar di Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB)
description The contractors must register with the Construction Industry Development Board (CIDB) before they are allowed to carry out of construction works. The statistics of registration of contractors at CIDB until June 2011 showed 62,811 contractors. However, the total of contractors did not awarded tender also high especially in the dormant category. The total of dormant contractor for 2011 was 5,539 contractors. The objectives of this study are to identify the factor that contractors being dormant from the viewpoint of the CIDB, to identify the factor that contractors being dormant from the viewpoint of the contractor, to identify the business diversification carried out by the dormant contractors and to identify the action to CIDB taken towards dormant contractors. The study is carried out in Johor Bahru. Data is collected through questionnaires and interviews. A total of 114 questionnaires are distributed to the respondents comprising of contractors, clients and CIDB. The data is analyzed using Average Index. From the study, the factors that contributed to the contractor being dormant from the viewpoint of CIDB are inadequate experience in construction, limited skill, inadequate financial resources, unwilling to take risk and the type of project. Thereof, the factors that contributed to the contractor being dormant from the viewpoint of the contractor are inadequate financial resources, failure getting the load, high cost of overhead, stiff of competition, and high price of document tender. The business diversifications of dormant contractors are service business and farming or agriculture. And the result from last objective showed the best action can be taken by CIDB to reduce total of dormant contractor is provide the incentive training to them.
format Thesis
qualification_level Master's degree
author Ismail, Asmah Munajah
author_facet Ismail, Asmah Munajah
author_sort Ismail, Asmah Munajah
title Masalah kontraktor dorman yang berdaftar di Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB)
title_short Masalah kontraktor dorman yang berdaftar di Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB)
title_full Masalah kontraktor dorman yang berdaftar di Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB)
title_fullStr Masalah kontraktor dorman yang berdaftar di Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB)
title_full_unstemmed Masalah kontraktor dorman yang berdaftar di Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB)
title_sort masalah kontraktor dorman yang berdaftar di lembaga pembangunan industri pembinaan malaysia (cidb)
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2012
url http://eprints.utm.my/id/eprint/32263/1/AsmahMunajahIsmailMFKA2012.pdf
_version_ 1747815960591466496