The knowledge, practices and challenges of developers in housing delivery systems in Malaysia
There are various types of housing delivery system in Malaysia which are Sell Then Buils (STB), Build Then Sell (BTS), 10:90 System (10:90) and 5/95 Home Loan Package (5/95). It is reported that most of the developers are practising the conventional system which is STB. In this context, it is import...
محفوظ في:
المؤلف الرئيسي: | Shu, Te Ying |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2012
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/32614/1/ShuTeYingMFKSG2012.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
The contribution and challenges faced by private developers in addressing the housing deficit in Ghana
بواسطة: Afrane, Ebenezer
منشور في: (2014) -
The impact of globalisation and liberalisation on the delivery system of thr residential (Housing) sub-sector of the real estate industry in Malaysia
بواسطة: Teo, Chee Hai
منشور في: (2003) -
Hill land development challenges in Penang Island
بواسطة: Amaranazan, Anilarasu
منشور في: (2010) -
Challenges by developer in lump sum procurement system
بواسطة: Tan, Patrick Paik Kuan
منشور في: (2003) -
The development of energy efficiency estimation system for domestic housing by using quality function deployment approach
بواسطة: A. Rahman, Khairunnisa
منشور في: (2017)