Comparative study of defect liability period practices between Malaysia and Nigeria
Defect liability period is the period contractor is liable to make good of the defects but how reasonable is the defects liability period to allow defects (patent and latent) to manifest? This thesis examines the occurrence of defects during and after the defect liability period and the contractual...
Saved in:
Main Author: | Oluwole, Alejo Ayodele |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/32802/1/AlejoAyodeleOluwoleMFAB2012.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Contractor's liability relating to defective works that are discovered after the defects liability period
by: Leong, Mei Wan
Published: (2010) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
by: Lim, Tze Shwan
Published: (2011) -
Limitation period in latent defects
by: Lin, Mazuan
Published: (2016) -
Contractor's liability to third party for defective works
by: Mohmad Zainordi, Zainab
Published: (2006) -
Defect study during defect liability period / Mohd Asrul Hassin
by: Hassin, Mohd Asrul
Published: (2010)