Transformation of delivering system: comparison study between Certificate of Fitness for Occupation (CFO) and Certificate of Completion and Compliance (CCC)

Delivering system in construction industry in Malaysia has been transformed from a Local Authority certification based (Certificate of Fitness for Occupation; CFO) to self-certification by a qualified person (Certificate of Completion and Compliance; CCC) starting from April 2007. The purpose of thi...

Full description

Saved in:
Bibliographic Details
Main Author: Zakaria, Adila
Format: Thesis
Language:English
Published: 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/32977/1/AdilaZakariaMFAB2012.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.32977
record_format uketd_dc
spelling my-utm-ep.329772018-05-27T08:05:33Z Transformation of delivering system: comparison study between Certificate of Fitness for Occupation (CFO) and Certificate of Completion and Compliance (CCC) 2012-01 Zakaria, Adila HD Industries. Land use. Labor Delivering system in construction industry in Malaysia has been transformed from a Local Authority certification based (Certificate of Fitness for Occupation; CFO) to self-certification by a qualified person (Certificate of Completion and Compliance; CCC) starting from April 2007. The purpose of this study is to identify differences between CFO and CCC delivering system in terms of procedures such as the process, and technical requirements, and also in terms of professional liabilities such as duty of care, biasness, and delay. Will the CCC be merely an ad hoc and simplistic solution to improve and speed up the delivering system? The findings of the study show the most preferable delivering system. The study has been done based on primary and secondary data. Data collections have been analyzed using qualitative and quantitative method. Ten (10) respondents participated in the survey and twenty (20) construction projects were chosen for case studies in this research. In the end, the following results were sought. Of the ten (10) respondents, nine (9) of respondents prefer CCC delivering system because the principles of CCC system improve the weakness of CFO system. Most of respondents state that CFO limits the professional liabilities while CCC extends the liabilities. As a conclusion, all related parties in construction project especially PSP must clearly understand with the procedures of delivering system and know their roles and liabilities to improve the system better. 2012-01 Thesis http://eprints.utm.my/id/eprint/32977/ http://eprints.utm.my/id/eprint/32977/1/AdilaZakariaMFAB2012.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Built Environment Faculty of Built Environment
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic HD Industries
Land use
Labor
spellingShingle HD Industries
Land use
Labor
Zakaria, Adila
Transformation of delivering system: comparison study between Certificate of Fitness for Occupation (CFO) and Certificate of Completion and Compliance (CCC)
description Delivering system in construction industry in Malaysia has been transformed from a Local Authority certification based (Certificate of Fitness for Occupation; CFO) to self-certification by a qualified person (Certificate of Completion and Compliance; CCC) starting from April 2007. The purpose of this study is to identify differences between CFO and CCC delivering system in terms of procedures such as the process, and technical requirements, and also in terms of professional liabilities such as duty of care, biasness, and delay. Will the CCC be merely an ad hoc and simplistic solution to improve and speed up the delivering system? The findings of the study show the most preferable delivering system. The study has been done based on primary and secondary data. Data collections have been analyzed using qualitative and quantitative method. Ten (10) respondents participated in the survey and twenty (20) construction projects were chosen for case studies in this research. In the end, the following results were sought. Of the ten (10) respondents, nine (9) of respondents prefer CCC delivering system because the principles of CCC system improve the weakness of CFO system. Most of respondents state that CFO limits the professional liabilities while CCC extends the liabilities. As a conclusion, all related parties in construction project especially PSP must clearly understand with the procedures of delivering system and know their roles and liabilities to improve the system better.
format Thesis
qualification_level Master's degree
author Zakaria, Adila
author_facet Zakaria, Adila
author_sort Zakaria, Adila
title Transformation of delivering system: comparison study between Certificate of Fitness for Occupation (CFO) and Certificate of Completion and Compliance (CCC)
title_short Transformation of delivering system: comparison study between Certificate of Fitness for Occupation (CFO) and Certificate of Completion and Compliance (CCC)
title_full Transformation of delivering system: comparison study between Certificate of Fitness for Occupation (CFO) and Certificate of Completion and Compliance (CCC)
title_fullStr Transformation of delivering system: comparison study between Certificate of Fitness for Occupation (CFO) and Certificate of Completion and Compliance (CCC)
title_full_unstemmed Transformation of delivering system: comparison study between Certificate of Fitness for Occupation (CFO) and Certificate of Completion and Compliance (CCC)
title_sort transformation of delivering system: comparison study between certificate of fitness for occupation (cfo) and certificate of completion and compliance (ccc)
granting_institution Universiti Teknologi Malaysia, Faculty of Built Environment
granting_department Faculty of Built Environment
publishDate 2012
url http://eprints.utm.my/id/eprint/32977/1/AdilaZakariaMFAB2012.pdf
_version_ 1747816071569604608