Implementation of Integrated Project Delivery (IPD) and Building Information Modelling (BIM) in the construction industry

To increase productivity, the global construction industry has adopted several different project delivery methods and IT tools over the last 10 years. Although there have been previous efforts to define and Implement new generation methods such as Integrated Project Delivery (IPD) and Building Infor...

Full description

Saved in:
Bibliographic Details
Main Author: Kaini, Iman
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.utm.my/id/eprint/33194/5/ImanKainiMFKA2013.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.33194
record_format uketd_dc
spelling my-utm-ep.331942017-09-12T06:48:03Z Implementation of Integrated Project Delivery (IPD) and Building Information Modelling (BIM) in the construction industry 2013-01 Kaini, Iman TA Engineering (General). Civil engineering (General) To increase productivity, the global construction industry has adopted several different project delivery methods and IT tools over the last 10 years. Although there have been previous efforts to define and Implement new generation methods such as Integrated Project Delivery (IPD) and Building Information Modeling (BIM) in the construction industry, but these concepts are still considered new-comers especially in most of developing countries. These countries widely use the traditional methods namely Design-Bid-Build (DBB) and Computer Aided Design (CAD) instead of using them. This study is to analyze Building Information Modeling (BIM) applications potential in the process of Integrated Project Delivery (IPD) and compare it with the Implementation process of conventional tool (CAD) into the Design –bid-build delivery method. For this reason, a case which is a three story residential apartment building located on Tehran is selected. The process of implementation of existing CAD drawings of this case into DBB will be analyzed. Then, the case will be modeled and simulated within BIM applications and its exploiting potential will be identified within IPD. It is expected that the shifting framework path from CAD-DBB into BIM-IPD based on the lessons learned from case study and conducted interviews are developed to clarify these concepts capabilities. 2013-01 Thesis http://eprints.utm.my/id/eprint/33194/ http://eprints.utm.my/id/eprint/33194/5/ImanKainiMFKA2013.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TA Engineering (General)
Civil engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
Kaini, Iman
Implementation of Integrated Project Delivery (IPD) and Building Information Modelling (BIM) in the construction industry
description To increase productivity, the global construction industry has adopted several different project delivery methods and IT tools over the last 10 years. Although there have been previous efforts to define and Implement new generation methods such as Integrated Project Delivery (IPD) and Building Information Modeling (BIM) in the construction industry, but these concepts are still considered new-comers especially in most of developing countries. These countries widely use the traditional methods namely Design-Bid-Build (DBB) and Computer Aided Design (CAD) instead of using them. This study is to analyze Building Information Modeling (BIM) applications potential in the process of Integrated Project Delivery (IPD) and compare it with the Implementation process of conventional tool (CAD) into the Design –bid-build delivery method. For this reason, a case which is a three story residential apartment building located on Tehran is selected. The process of implementation of existing CAD drawings of this case into DBB will be analyzed. Then, the case will be modeled and simulated within BIM applications and its exploiting potential will be identified within IPD. It is expected that the shifting framework path from CAD-DBB into BIM-IPD based on the lessons learned from case study and conducted interviews are developed to clarify these concepts capabilities.
format Thesis
qualification_level Master's degree
author Kaini, Iman
author_facet Kaini, Iman
author_sort Kaini, Iman
title Implementation of Integrated Project Delivery (IPD) and Building Information Modelling (BIM) in the construction industry
title_short Implementation of Integrated Project Delivery (IPD) and Building Information Modelling (BIM) in the construction industry
title_full Implementation of Integrated Project Delivery (IPD) and Building Information Modelling (BIM) in the construction industry
title_fullStr Implementation of Integrated Project Delivery (IPD) and Building Information Modelling (BIM) in the construction industry
title_full_unstemmed Implementation of Integrated Project Delivery (IPD) and Building Information Modelling (BIM) in the construction industry
title_sort implementation of integrated project delivery (ipd) and building information modelling (bim) in the construction industry
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2013
url http://eprints.utm.my/id/eprint/33194/5/ImanKainiMFKA2013.pdf
_version_ 1747816102097846272