Thamodharan, M. (2013). Lighting performance study on existing 275KV overhead line in TNB system.
Chicago Style (17th ed.) CitationThamodharan, Muralitharan. Lighting Performance Study on Existing 275KV Overhead Line in TNB System. 2013.
MLA (8th ed.) CitationThamodharan, Muralitharan. Lighting Performance Study on Existing 275KV Overhead Line in TNB System. 2013.
Warning: These citations may not always be 100% accurate.