Selection of the industrialized building material supplier by analytic hierarchy process method
Industrialized Building system (IBS) aims to expedite the process of installation and construction at site. Industrialized Building System (IBS) is a construction system that is built using pre-fabricated components. The manufacturing of the components is systematically done using machine, formworks...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/33277/1/MohammadYousefMoravvejiMFKA2013.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|