Service of notice for determination in construction contracts
Determination is a remedy provided under contract for a party to discharge his obligations upon breach by the other party. When the party to contract intends to determine a contract, he must let the other party knows his intention to do so. He is required to follow several procedures before he is sa...
محفوظ في:
المؤلف الرئيسي: | Wan Ibrahim, Wan Mohd. Izzuddin |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2011
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/33659/5/WanMohdIzzuddinWanIbrahimMFAB2011.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Notice of loss and/or expense claim in PAM 2006
بواسطة: Titus, Olalekan Olaolu
منشور في: (2009) -
Notice condition precedent to claim liquidated ascertained damages (LAD)
بواسطة: Mansor, Nur Syaimasyaza
منشور في: (2011) -
Issues associates with communicating the architect notice by means of e-mail under PAM 2006
بواسطة: Sainee, Norazean
منشور في: (2015) -
Contracting out of statutory provision in Malaysian construction contract
بواسطة: Lee, Sze Yin
منشور في: (2010) -
Quantum meruit in construction contracts
بواسطة: Mat Jusoh, Zairra
منشور في: (2011)