Risk management in toll road project under public private partnership scheme (case study: Jakarta Outer Ring Toad (JORR) W1)

The risk is believed to be unavoidable. With regard to the public sector which demands transparency and performance improvements with limited funds, the risks faced by government agencies will be growing and increasing. Therefore, an understanding of risk become important to be able to determine pri...

Full description

Saved in:
Bibliographic Details
Main Author: Permana, Heru Rahmat
Format: Thesis
Language:English
Published: 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/33743/1/HeruRahmatPermanaMFAB2012.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.33743
record_format uketd_dc
spelling my-utm-ep.337432018-04-27T01:26:47Z Risk management in toll road project under public private partnership scheme (case study: Jakarta Outer Ring Toad (JORR) W1) 2012-08 Permana, Heru Rahmat HD Industries. Land use. Labor The risk is believed to be unavoidable. With regard to the public sector which demands transparency and performance improvements with limited funds, the risks faced by government agencies will be growing and increasing. Therefore, an understanding of risk become important to be able to determine priorities and program strategies in the achievement of organizational goals. The success of the project depends on how the risk can be managed. Proper risk management regarded as the key factors of project success. This study identifies the risk in toll road project. The main methodologies used in data collections for this study are literature reviews and secondary data collection. Descriptive statistic analysis is used to figure and describe the types of risk and its occurrence. The result shows that there are five types of risk that identified in this study which are design change (46,2%), work accident (23,1%), severe weather condition (15,4%), late equipment supply (7%) and site safety (7%). This design risk greatly affects the construction activities JORR W1. 2012-08 Thesis http://eprints.utm.my/id/eprint/33743/ http://eprints.utm.my/id/eprint/33743/1/HeruRahmatPermanaMFAB2012.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:70515?site_name=Restricted Repository masters Universiti Teknologi Malaysia, Faculty of Built Environment Faculty of Built Environment
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic HD Industries
Land use
Labor
spellingShingle HD Industries
Land use
Labor
Permana, Heru Rahmat
Risk management in toll road project under public private partnership scheme (case study: Jakarta Outer Ring Toad (JORR) W1)
description The risk is believed to be unavoidable. With regard to the public sector which demands transparency and performance improvements with limited funds, the risks faced by government agencies will be growing and increasing. Therefore, an understanding of risk become important to be able to determine priorities and program strategies in the achievement of organizational goals. The success of the project depends on how the risk can be managed. Proper risk management regarded as the key factors of project success. This study identifies the risk in toll road project. The main methodologies used in data collections for this study are literature reviews and secondary data collection. Descriptive statistic analysis is used to figure and describe the types of risk and its occurrence. The result shows that there are five types of risk that identified in this study which are design change (46,2%), work accident (23,1%), severe weather condition (15,4%), late equipment supply (7%) and site safety (7%). This design risk greatly affects the construction activities JORR W1.
format Thesis
qualification_level Master's degree
author Permana, Heru Rahmat
author_facet Permana, Heru Rahmat
author_sort Permana, Heru Rahmat
title Risk management in toll road project under public private partnership scheme (case study: Jakarta Outer Ring Toad (JORR) W1)
title_short Risk management in toll road project under public private partnership scheme (case study: Jakarta Outer Ring Toad (JORR) W1)
title_full Risk management in toll road project under public private partnership scheme (case study: Jakarta Outer Ring Toad (JORR) W1)
title_fullStr Risk management in toll road project under public private partnership scheme (case study: Jakarta Outer Ring Toad (JORR) W1)
title_full_unstemmed Risk management in toll road project under public private partnership scheme (case study: Jakarta Outer Ring Toad (JORR) W1)
title_sort risk management in toll road project under public private partnership scheme (case study: jakarta outer ring toad (jorr) w1)
granting_institution Universiti Teknologi Malaysia, Faculty of Built Environment
granting_department Faculty of Built Environment
publishDate 2012
url http://eprints.utm.my/id/eprint/33743/1/HeruRahmatPermanaMFAB2012.pdf
_version_ 1747816174250360832