Risk management in toll road project under public private partnership scheme (case study: Jakarta Outer Ring Toad (JORR) W1)
The risk is believed to be unavoidable. With regard to the public sector which demands transparency and performance improvements with limited funds, the risks faced by government agencies will be growing and increasing. Therefore, an understanding of risk become important to be able to determine pri...
محفوظ في:
المؤلف الرئيسي: | Permana, Heru Rahmat |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2012
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/33743/1/HeruRahmatPermanaMFAB2012.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Public private partnership : Malaysian toll highways /
بواسطة: Siti Sarah Ainur Hadie
منشور في: (2016) -
The Influencing Factors Of Decision Makers’ Behavioural Into Involvement In Public-Private Partnership (Ppp) Toll Expressway Projects In Malaysia
بواسطة: Syaromi Ramli -
Comparative study of BOT toll road arrangements between Indonesia and Malaysia /
بواسطة: Kasudarman, Kurniawan
منشور في: (1998) -
A lesson from the Sedyatmo package 4 additional elevated lane toll road project
بواسطة: Tri Prakoso, Endar
منشور في: (2011) -
A study of occupational noise exposure among toll tellers at Toll Plaza /
بواسطة: Hamidi Saidin
منشور في: (2009)