Predicting the required duration for construction activities using Artificial Neural Networks
The duration of a construction project is a key factor to consider before the project starts, as it can determine the success or failure of the project. Difficulties in estimating the duration of activities that can also lead to error if manually estimate it. The main purpose of this study is to dev...
Saved in:
Main Author: | Golizadeh, Hamed |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/33824/5/HamedGolizadehMFKA2013.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Meshfree formulation for inverse frequencies analysis incorporating artificial neural network
by: Abd. Nazir, Mohd. Zhafri Jamil
Published: (2013) -
A compressive concrete strength prediction model using artificial neural networks
by: Guoji, Zang
Published: (2017) -
Cost of compliance with safety and health requirements in construction site
by: Sulong, Akmal Wani
Published: (2009) -
The incorporation of maintenance requirements and planning at the design and construction stages : a case study
by: Mohd. Shah, Zulkarnain
Published: (2000) -
Construction coordination activities in local construction industry
by: Lau , Guan Heng
Published: (2004)