Predicting the required duration for construction activities using Artificial Neural Networks
The duration of a construction project is a key factor to consider before the project starts, as it can determine the success or failure of the project. Difficulties in estimating the duration of activities that can also lead to error if manually estimate it. The main purpose of this study is to dev...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2013
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/33824/5/HamedGolizadehMFKA2013.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
成为第一个发表评论!