Contractor's liabilities towards employer's defective building work claims during defect liability period
The contractor's liability towards the defects discovered during defect liability period is related to the issue of their rights and liability during that period. The issues included are the employer?s obligation to notify the contractor of defects, the contractor's liability towards defec...
Saved in:
Main Author: | Lim, Tze Shwan |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/33932/5/LimTzeShwanMFAB2011.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Contractor's liability relating to defective works that are discovered after the defects liability period
by: Leong, Mei Wan
Published: (2010) -
Contractor's liability to third party for defective works
by: Mohmad Zainordi, Zainab
Published: (2006) -
Defect study during defect liability period / Mohd Asrul Hassin
by: Hassin, Mohd Asrul
Published: (2010) -
Comparative study of defect liability period practices between Malaysia and Nigeria
by: Oluwole, Alejo Ayodele
Published: (2012) -
Employer's rights and contractor's liabilities in relation to construction defects after final certificate
by: Tan, Pei Ling
Published: (2007)