A study on identifying factors affecting project performance on road construction project

This study identifies the project performance of road construction projects which are owned by Government of Indonesia and focuses only on the owner’s perspective. The objectives of the owner are the project completed within specified time and actual cost is not exceed the budget and, which differs...

Full description

Saved in:
Bibliographic Details
Main Author: Taufik, Mohamad
Format: Thesis
Language:English
Published: 2012
Subjects:
Online Access:http://eprints.utm.my/id/eprint/34574/1/MohamadTaufikMFAB2012.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.34574
record_format uketd_dc
spelling my-utm-ep.345742018-04-27T01:29:03Z A study on identifying factors affecting project performance on road construction project 2012-08 Taufik, Mohamad TH Building construction This study identifies the project performance of road construction projects which are owned by Government of Indonesia and focuses only on the owner’s perspective. The objectives of the owner are the project completed within specified time and actual cost is not exceed the budget and, which differs from contractor’s point of view in which they want to obtain more profit. Project performance of the road is very crucial for the end-user who travel from one place to another place in order to fulfill the need of transportation of people, good, and service therefore it can increase the economic’s growth of local people around the road and so does national economic growth. From the literature review, the success of the project can be measured from 13 categories, namely: internal complexity, external complexity, supervision and control, owner involvement, design effectiveness, schedule management, budget management, quality management, human resource management, construction resource management, construction method, communication and report and team relationship. That categories will be elaborated into 65 questions. Data collected from the owner’s project manager who located in one of four provinces, namely South Sumatra, Lampung, Bangka Belitung and Bengkulu. Before analyzing data, that data must be tested its reliability by Cronbach’s alpha to find out its validity. Then, data analyzed by the the Pearson correlation and Multiple regression analysis. The result shows that the sechedule management and budget management are highly affected the project performance. 2012-08 Thesis http://eprints.utm.my/id/eprint/34574/ http://eprints.utm.my/id/eprint/34574/1/MohamadTaufikMFAB2012.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:69752?site_name=Restricted Repository masters Universiti Teknologi Malaysia, Faculty of Built Environment Faculty of Built Environment
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TH Building construction
spellingShingle TH Building construction
Taufik, Mohamad
A study on identifying factors affecting project performance on road construction project
description This study identifies the project performance of road construction projects which are owned by Government of Indonesia and focuses only on the owner’s perspective. The objectives of the owner are the project completed within specified time and actual cost is not exceed the budget and, which differs from contractor’s point of view in which they want to obtain more profit. Project performance of the road is very crucial for the end-user who travel from one place to another place in order to fulfill the need of transportation of people, good, and service therefore it can increase the economic’s growth of local people around the road and so does national economic growth. From the literature review, the success of the project can be measured from 13 categories, namely: internal complexity, external complexity, supervision and control, owner involvement, design effectiveness, schedule management, budget management, quality management, human resource management, construction resource management, construction method, communication and report and team relationship. That categories will be elaborated into 65 questions. Data collected from the owner’s project manager who located in one of four provinces, namely South Sumatra, Lampung, Bangka Belitung and Bengkulu. Before analyzing data, that data must be tested its reliability by Cronbach’s alpha to find out its validity. Then, data analyzed by the the Pearson correlation and Multiple regression analysis. The result shows that the sechedule management and budget management are highly affected the project performance.
format Thesis
qualification_level Master's degree
author Taufik, Mohamad
author_facet Taufik, Mohamad
author_sort Taufik, Mohamad
title A study on identifying factors affecting project performance on road construction project
title_short A study on identifying factors affecting project performance on road construction project
title_full A study on identifying factors affecting project performance on road construction project
title_fullStr A study on identifying factors affecting project performance on road construction project
title_full_unstemmed A study on identifying factors affecting project performance on road construction project
title_sort study on identifying factors affecting project performance on road construction project
granting_institution Universiti Teknologi Malaysia, Faculty of Built Environment
granting_department Faculty of Built Environment
publishDate 2012
url http://eprints.utm.my/id/eprint/34574/1/MohamadTaufikMFAB2012.pdf
_version_ 1747816207588786176