Simulation of industrialised building system components production

The construction of IBS building starts with the production of the IBS components and the production process is the main activity concern in the IBS production plant. Having an optimum production line to manufacture the required IBS elements within targeted time and limited number of reusable steel...

全面介绍

Saved in:
书目详细资料
主要作者: Ng, Soon Ching
格式: Thesis
语言:English
出版: 2006
主题:
在线阅读:http://eprints.utm.my/id/eprint/3593/1/NgSoonChingMFKA2006ABS.pdf
标签: 添加标签
没有标签, 成为第一个标记此记录!
id my-utm-ep.3593
record_format uketd_dc
spelling my-utm-ep.35932018-06-25T03:19:57Z Simulation of industrialised building system components production 2006-04 Ng, Soon Ching TA Engineering (General). Civil engineering (General) The construction of IBS building starts with the production of the IBS components and the production process is the main activity concern in the IBS production plant. Having an optimum production line to manufacture the required IBS elements within targeted time and limited number of reusable steel mould is very important. In this study, workstation organization method has been adopted in the production of IBS beam and column. Witness 2001 simulation software has been used to model and simulate the most optimum production line set up. Basically, two production lines set up have been proposed to complete the production of IBS beam and column between two and three months time with limited number of reusable steel mould to supply for the construction of medium size single storey IBS housing project ranging from 100 to 300 units. A contingency production line set up which able to complete the production of required IBS components within a month time with increased number of reusable steel mould has also been proposed. Number of resources such as workstation, tool, storage area and labour has been determined from the proposal. The proposed production line can be applied in the planning and cost estimating of IBS production plant set up. 2006-04 Thesis http://eprints.utm.my/id/eprint/3593/ http://eprints.utm.my/id/eprint/3593/1/NgSoonChingMFKA2006ABS.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Civil Engineering Faculty of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TA Engineering (General)
Civil engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
Ng, Soon Ching
Simulation of industrialised building system components production
description The construction of IBS building starts with the production of the IBS components and the production process is the main activity concern in the IBS production plant. Having an optimum production line to manufacture the required IBS elements within targeted time and limited number of reusable steel mould is very important. In this study, workstation organization method has been adopted in the production of IBS beam and column. Witness 2001 simulation software has been used to model and simulate the most optimum production line set up. Basically, two production lines set up have been proposed to complete the production of IBS beam and column between two and three months time with limited number of reusable steel mould to supply for the construction of medium size single storey IBS housing project ranging from 100 to 300 units. A contingency production line set up which able to complete the production of required IBS components within a month time with increased number of reusable steel mould has also been proposed. Number of resources such as workstation, tool, storage area and labour has been determined from the proposal. The proposed production line can be applied in the planning and cost estimating of IBS production plant set up.
format Thesis
qualification_level Master's degree
author Ng, Soon Ching
author_facet Ng, Soon Ching
author_sort Ng, Soon Ching
title Simulation of industrialised building system components production
title_short Simulation of industrialised building system components production
title_full Simulation of industrialised building system components production
title_fullStr Simulation of industrialised building system components production
title_full_unstemmed Simulation of industrialised building system components production
title_sort simulation of industrialised building system components production
granting_institution Universiti Teknologi Malaysia, Faculty of Civil Engineering
granting_department Faculty of Civil Engineering
publishDate 2006
url http://eprints.utm.my/id/eprint/3593/1/NgSoonChingMFKA2006ABS.pdf
_version_ 1747814457796460544