Simulation of industrialised building system components production
The construction of IBS building starts with the production of the IBS components and the production process is the main activity concern in the IBS production plant. Having an optimum production line to manufacture the required IBS elements within targeted time and limited number of reusable steel...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2006
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/3593/1/NgSoonChingMFKA2006ABS.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|