The delay in the first lift from vessel alongside and the effect on overall vessel gross productivity
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Published: |
2009
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-utm-ep.36230 |
---|---|
record_format |
uketd_dc |
spelling |
my-utm-ep.362302014-01-01T07:06:15Z The delay in the first lift from vessel alongside and the effect on overall vessel gross productivity 2009 Murugiah, Navinder Unspecified 2009 Thesis http://eprints.utm.my/id/eprint/36230/ masters Universiti Teknologi Malaysia, Faculty of Built Environment Faculty of Built Environment |
institution |
Universiti Teknologi Malaysia |
collection |
UTM Institutional Repository |
topic |
Unspecified |
spellingShingle |
Unspecified Murugiah, Navinder The delay in the first lift from vessel alongside and the effect on overall vessel gross productivity |
description |
|
format |
Thesis |
qualification_level |
Master's degree |
author |
Murugiah, Navinder |
author_facet |
Murugiah, Navinder |
author_sort |
Murugiah, Navinder |
title |
The delay in the first lift from vessel alongside and the effect on overall vessel gross productivity
|
title_short |
The delay in the first lift from vessel alongside and the effect on overall vessel gross productivity
|
title_full |
The delay in the first lift from vessel alongside and the effect on overall vessel gross productivity
|
title_fullStr |
The delay in the first lift from vessel alongside and the effect on overall vessel gross productivity
|
title_full_unstemmed |
The delay in the first lift from vessel alongside and the effect on overall vessel gross productivity
|
title_sort |
delay in the first lift from vessel alongside and the effect on overall vessel gross productivity |
granting_institution |
Universiti Teknologi Malaysia, Faculty of Built Environment |
granting_department |
Faculty of Built Environment |
publishDate |
2009 |
_version_ |
1747816414495899648 |