The delay in the first lift from vessel alongside and the effect on overall vessel gross productivity
Saved in:
Main Author: | Murugiah, Navinder |
---|---|
Format: | Thesis |
Published: |
2009
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Petroleum terminal's operation processes on vessel turnaround time
by: Ng, Siew Ming
Published: (2009) -
Vessels classification
by: Suriani, Nor Surayani
Published: (2006) -
Vessels classification
by: Suriani, Nor Surayahani
Published: (2006) -
Vessels classification
by: Suriani, Nor Surayahani
Published: (2006) -
A first principle approach for the strength analysis of a semi-swath vessel
by: Ahmad, Shaharudin
Published: (2015)